| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAdmitted-Finance | ₹8.8 L | L1 | Admitted-Finance |
| 2 | L2₹9.4 LAdmitted-Finance | ₹9.4 L | L2 | Admitted-Finance |
| 3 | L3₹10.2 LAdmitted-Finance | ₹10.2 L | L3 | Admitted-Finance |
| 4 | L4₹10.8 LAdmitted-Finance | ₹10.8 L | L4 | Admitted-Finance |
| 5 | L5₹11 LAdmitted-Finance | ₹11 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | IMPLA GENERAL SUPPLIERS L5 | M/S PARVAIZ ENTERPRISES L3 | RIM ELECTRICALS & SUPPLIERS L2 | NICE ELECTRIC SOLUTION L4 | GREEN VALLEY ELECTRICALS L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Work items identified; | ||||||||
| 1.10 | Supply, installation, testing and commisioning of 200 kVA ,11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound , and with LV
Cable Box having detachable Aluminium Gland plate complete in all respect as per Standards. | 1 | No. | 2,70,390 ₹2.7 L | 2,70,000 ₹2.7 L | 5,47,900 ₹5.5 L | 2,95,000 ₹3.0 L | 2,85,000 ₹2.9 L |
| 2.10 | Supply, installation, testing and commisioning of 9 mtr (410 SP-33) long Steel Tubular Poles complete with base plate(350x350x5mm), top cap, Earthing Channel(75x40x6mm) including digging of pit positioning etc, complete in all respect as per Standards. | 7 | Nos. | 16,500 ₹1.2 L | 15,000 ₹1.1 L | 8,000 ₹56,000 | 17,000 ₹1.2 L | 17,000 ₹1.2 L |
| 3.10 | Supply, laying, stringing, tensioning,of 120 sqmm AB(HT) Cable(3x120+1x95 insulated) sqmm XLPE(11KV,3C+Earth) as per kPDCL standards | 0.3 | Km. | 12,00,000 ₹3.6 L | 10,50,000 ₹3.1 L | 1,10,000 ₹33,000 | 11,00,000 ₹3.3 L | 7,50,000 ₹2.3 L |
| 4.10 | Supply,and fixiing of heat shrinkable termination kits for 11 kv AB cable 120 sqmm as per KPDCL standards. | 2 | NO | 2,000 ₹4,000 | 3,000 ₹6,000 | 2,550 ₹5,100 | 3,000 ₹6,000 | 1,500 ₹3,000 |
| 5.10 | Supply,and fixing Suspension/Tension Clamp with eye hook as per KPDCL standards. | 6 | NO | 500 ₹3,000 | 600 ₹3,600 | 300 ₹1,800 | 100 ₹600 | 100 ₹600 |
| 6.10 | Supply, laying, stringing, tensioning,of 30 sqmm ACSR condcutor as per KPDCL standards. | 0.45 | Km. | 30,000 ₹13,500 | 100 ₹45 | 10 ₹4.50 | 15,000 ₹6,750 | 20,000 ₹9,000 |
| 7.10 | Supply,Carraige upto site and fixing of GI V cross-arm with top Bracket including clamp duly fabricated as per site requirement including clamps(50x8 mm), GI Nuts & Bolts,washers etc complete in all respects as per standards. | 147 | Kg | 125 ₹18,375 | 115 ₹16,905 | 10 ₹1,470 | 115 ₹16,905 | 90 ₹13,230 |
| 8.10 | Supply,Carraige upto site, fixing and installation of GI Channels of different sizes including clamps and braces. | 300 | Kg | 120 ₹36,000 | 80 ₹24,000 | 105 ₹31,500 | 115 ₹34,500 | 90 ₹27,000 |
| 9.10 | Supply,Carraige upto site,Installation,testing and Commissioning of 11kV Polymeric composite Pin Insulators 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance
320mm complete in all respects as per standards. | 21 | No. | 200 ₹4,200 | 175 ₹3,675 | 25 ₹525 | 250 ₹5,250 | 100 ₹2,100 |
Tender Value
₹12.3 L
EMD Value
₹24,700
Closing Date
5 Jan 2026, 6:00 pmClosed
Executive Engineer ED Budgam KPDCL
ED Budgam, KPDCL
Creation of 200 kVA substation along with HT/LT network for EV Charging point at Sultan Fuels B K Pora under the jurisdiction of ED Budgam KPDCL.
2025_PDD_299061_1
EDB/97 of 2025-26
Open Tender
Electrical and Maintenance Works
30 days
ED Budgam, KPDCL
AS PER SBD
7 documents required · 7 mandatory
₹1,000
Executive Engineer ED Budgam KPDCL
₹24,700
6 Jan 2026
24 Dec 2025
6 Jan 2026
24 Dec 2025
5 Jan 2026
26 Dec 2025
24 Dec 2025 - 26 Dec 2025
Amount
Work items identified;
Supply, installation, testing and commisioning of 200 kVA ,11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound , and with LV Cable Box having detachable Aluminium Gland plate complete in all respect as per Standards.
Supply, installation, testing and commisioning of 9 mtr (410 SP-33) long Steel Tubular Poles complete with base plate(350x350x5mm), top cap, Earthing Channel(75x40x6mm) including digging of pit positioning etc, complete in all respect as per Standards.
Supply, laying, stringing, tensioning,of 120 sqmm AB(HT) Cable(3x120+1x95 insulated) sqmm XLPE(11KV,3C+Earth) as per kPDCL standards
Supply,and fixiing of heat shrinkable termination kits for 11 kv AB cable 120 sqmm as per KPDCL standards.
Supply,and fixing Suspension/Tension Clamp with eye hook as per KPDCL standards.
Supply, laying, stringing, tensioning,of 30 sqmm ACSR condcutor as per KPDCL standards.
Supply,Carraige upto site and fixing of GI V cross-arm with top Bracket including clamp duly fabricated as per site requirement including clamps(50x8 mm), GI Nuts & Bolts,washers etc complete in all respects as per standards.
Supply,Carraige upto site, fixing and installation of GI Channels of different sizes including clamps and braces.
Supply,Carraige upto site,Installation,testing and Commissioning of 11kV Polymeric composite Pin Insulators 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm complete in all respects as per standards.
Supply,Carraige upto site,Installation,testing and Commissioning of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm complete in all respects as per standards.
Supply, Carraige upto site, installation, testing and Commissioning of Gapless Surge Arrestor 9 kV, 10 kA, LA with polymer housing, Stn. Type complete in all respects as per standards.
Supply, Carraige upto site, installation, testing and Commissioning of 11 kV G.O AB Switch 3-phase, 3 pole 200-Amp, vertical Type with fittings complete in all respects as per standards.
Supply, Carraige upto site, installation, testing and Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A complete in all respects as per standards.
Supply, Carraige upto site, laying, stringing, tensioning, binding of 240 mm² (1Ckt )1.1kV Grade, XLPE Insulated Stranded Conductor FRLS type cable complete in all respects as per standards.
Supply, Carraige upto site, installation, testing and Commissioning of LT Distribution Box for 200 kVA DTR with 315 Amp MCCB 3P 25 kA for incomer & 160 Amp MCCB 3P 16 kA 3 No.s for Outgoing Circuitscomplete in all respects as per standards.
a)11kV Pilfer resistant metering cubicle for 3phase 4 wire metering system made of MS Sheet steel thickness not less than 2mm duly power coat painted suitable for indoor as well as outdoor as per the site requirement. The cubicle shall be painted through 7-tank process. The External dimensions should be adequate. Panel having two compartments upper Meter compartment and lower CT/PT compartment. Provided with synthetic or semi synthetic gasket firmly glued to the sufrace, Dust, weather and Vermin proof and shall comply degree of protection IP 65 both the chambers having one sided hinged door arrangments. The metering panel shall be provided with two No G.I channels of size 100 x 50 mm on the front and rear sides duly welded and 4 No of lifting hooks. It should be possible to take meter reading manually, through CMRI and computer without opening the LV chamber door. b)Single Phase, Single core, single ratio, Epoxy resin Cast Current Transformers suitable for 11kV, copper wound primary type with rated burden 5VA and accuracy class 0.5 or better and conforming to IS2705 (part-I & II) amended upto date. ISF shall be upto 5.5The CT ratio shall be as under 15/5. c)11kV/ 110 V, Three phase epoxy resin cast PT with rated burden 15VA per phase and accuracy class 0.5 or better and conforming to IS:3156 (part-I&II) amended upto date with proper colour coded identification. PTs shall be of uniform insulating and withstand separate source 23kV pf for one minute. d) Bus Bar details:CTs bus bar:- 40x6 mm copper strip or adequate size PTs bus bar: Copper wire 8 SWG or 30x0.6mm copper flat strip to connect PT terminal or adequate size duly insulated by the monoplast tape e) PVC Copper wire flexible multi-strand of required size for secondary connections for CT wiring the minimum wire size shall be 4 mm² (RYB) and for PT wiring minimum wire size shall be 2.5 mm² (RYB). f) Copper Lugs preferably ring type duly crimped for termination of wires and tapes g) Grounding bus of minimum 40mm copper, 25cm long fixed to the unit in HV chamber. The CTs, PT meter and 11kV Cable sheath shall be grounded to the bus through grounding wire (green) of min size 10mm² h) 3Ph3 Wire HT CT/PT operated Fully static Smart Tri-Vector Energymeters DLMS Compliant Category 'C' with RS 232 port for modem compatibility. 11kV/110V, Ph-Ph (3P,3W) meters for measurement of different electrical parameters including Active Energy (kWh/ MWh), Reactive Energy (kVArh/MVArh), Apparent Energy (kVAh/ MVAh) etc. i) Independent flexible PVC pipes for CT wiring and PT wiring of appropriate size from HT compartment to meter compartment j) Pedestal made out of G.I Channel of size 75 x 40 mm or angle iron of size (65 x 65 x 5) mm, duly painted as per site requirement for mounting of metering panel including concrete foundation wherever required including cost of nuts and bolts
3 Core 11 kV Aluminium cable XLPE armoured 35 mm² including cost of clamp for its fixing where ever required.
Cable termination kits suitable for 3 x 35 mm² XLPE Cable (Indoor/Outdoor)
Earthing by way of 40 mm 2.5 mtr long GI Pipe. Job includes , excavation, enhancement material and Main Hole Chamber (500x450x600)mm with frame and cover.
Earthing of substation-Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239. GI Strip for neutral earthing of size 25 mmx3 mm, for connection of transformer body,G.O set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover complete in all respects as per standards.
Cement bottoming 1:2:4 mix as per Standards 0.5cum/0.45 cum pole comlete in all respects.
Earthing of steel tubular poles complete by GI pipe 40mm or GI rod 20mm 3.0 mtr long through GI strip 25x3 as per standards.
Painting of Poles with one coat of Red Oxide and two coats of alimunium paint to give uniform shine.
Supply and fixing of GI barbed wire Anti climbind Device with clamps complete in all respects as per Standards
Supply and fixing of danger plates with clamps complete in all respects as per Standards
Supply of safety helmets conforming to safety standards with ISI marks.
Supply of wooden ladder 20 ft long
Paint mark of scheme
NOTE: 1.The rates quoted by the bidder for all the items shall be inclusive of GST/freight/insurance/storage/installation/testing and any other charges Creation of 200 kVA sub station along with HT/LT network for EV Charging point at Sultan Fuels B K Pora under the jurisdiction of ED Budgam, KPDCL.
RIM ELECTRICALS & SUPPLIERS (BID ID -2688318)
M/S PARVAIZ ENTERPRISES (BID ID -2688670)
NICE ELECTRIC SOLUTION (BID ID -2688216)
IMPLA GENERAL SUPPLIERS (BID ID -2687576)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.48 MB
Tendernotice_2.pdf
PDF • 1.64 MB
BOQ_969888.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid