Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.4 CrAccepted-AOC | ₹5.4 Cr | 1 | Accepted-AOC Lowest Negotiated Bidder |
| 2 | 2₹5.7 Cr+₹28.8 L (5.31%)Rejected-Finance | ₹5.7 Cr+₹28.8 L (5.31%) | 2 | Rejected-Finance Quoted amount is more. Not eligible for negotiation |
| 3 | 3₹5.9 Cr+₹49.9 L (9.21%)Rejected-Finance | ₹5.9 Cr+₹49.9 L (9.21%) | 3 | Rejected-Finance Quoted amount is more. Not eligible for negotiation |
Tender Value
₹5.4 Cr
EMD Value
₹2.9 L
Closing Date
10 Jul 2020, 11:00 amClosed
Superintending Engineer H C and M Chennai Circle
No.299 Anna Salai, Teynampet Chennai - 600006
Package No. 25 Widening and Strengthening works including upkeeping for a period of 60 months and CD works in Tiruttani (H) C and M Sub Division Jurisdiction
2020_HWAY_165800_1
TN.02/TVR/Package - 25/CRIDP - 2020-2021
Open Tender
Civil Works - Highways
Percentage
270 days
Tiruthani
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹2.9 L
20 Oct 2020
1 Jun 2020
13 Jul 2020
1 Jun 2020
10 Jul 2020
12 Jun 2020
4 Jun 2020 - 8 Jun 2020
eProcurement System Government of Tamil Nadu Created By: Subramani Karthikeyan Created Date/Time: 07-Aug-2020 03:49 PM Tender Title: TVR Package No. 25 CRIDP 2020-2021 Tender ID: 2020_HWAY_165800_1
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Chennai Circle
Name of work : Package 25 - Widening and Strengthening works including upkeeping for a period of 60 months and CD works in Tiruttani (H) C&M Sub Division Jurisdiction A) Construction of Drain at Km 105/4 - 105/8 of Sadras - Chengalpattu - Kanchipuram - Arakkonam - Tiruttani road (SH 58) (01-CRIDP-20 - 21 -S-0137) B) Construction of Drain at Km107/350 - 107/450 of Sadras - Chengalpattu - Kanchipuram - Arakkonam - Tiruttani road (SH 58) (01-CRIDP-20 - 21 -S-0138) C) Construction of Retaining wall at Km 10/4 of Tiruttani - Podatturpet - Pallipet road (SH 106) (01-CRIDP-20 - 21 -S-139) D) Widening from Single lane to Double lane and Strengthening at Km 6/0 - 7/6 of Thalavedu - Poonimangadu road including upkeeping for a period of 60 months (01-CRIDP-20-21-O-2437) E) Widening from Single lane to Double lane and Strengthening at Km 7/6 - 9/4 of Thalavedu - Poonimangadu road including upkeeping for a period of 60 months (01-CRIDP-20-21-O-2438) F) Construction of Drain at Km 38/0 - 39/0 of Chittoor - Tiruttani road (SH 54) (01-CRIDP-20 - 21 -S-0135) G) Reconstruction of Box culvert at Km 0/6, 0/8, &0/10 of Maddur - Alamelumangapuram road (01-CRIDP-20-21-O-2469) H) Construction of Drain at Km 1/2 - 1/6 of Tiruttani - Nagalapuram road (MDR 719) (01-CRIDP-20 - 21 -M-1262)
Contract No: TN.No.02 SI.No.03
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 S.BABU 48390077.237 5.300 57069321.000 Five Crore Seventy Lakh Sixty Nine Thousand Three Hundred and Twenty One
2.00 P Saravanan 48390077.237 9.200 59183000.000 Five Crore Ninty One Lakh Eighty Three Thousand
3.00 M/S. Sri Masilamani Constructions 48390077.237 -0.010 54191467.000 Five Crore Fourty One Lakh Ninty One Thousand Four Hundred and Sixty Seven
Lowest Amount Quoted BY: M/S. Sri Masilamani Constructions(54191467.000)
BOQ Summary Details Tender Title: TVR Package No. 25 CRIDP 2020-2021 Tender ID: 2020_HWAY_165800_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 M/S. Sri Masilamani Constructions 54191467.000 L1
3 P Saravanan 59183000.000 L3
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .