Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-Finance | L1 | Accepted-Finance Qualified in the Technical Evaluation | |
| 2 | L2₹4.9 L+₹346.97 (0.07%)Accepted-Finance NO 14 48 PILLAIYAR KOVIL STREET CHEYYUR TALUK PERUMBAKKAM CHENGALPATTU 603 302 | CHENGALPATTU | TAMIL NADU | 603302 | L2 | Accepted-Finance Qualified in the Technical Evaluation | |
| 3 | L3₹5.0 L+₹4,561.21 (0.92%)Accepted-Finance | L3 | Accepted-Finance Qualified in the Technical Evaluation | |
| 4 | L4₹5.2 L+₹24,761.41 (5.01%)Accepted-Finance | L4 | Accepted-Finance Qualified in the Technical Evaluation |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
19 Apr 2023, 3:00 pmClosed
The Block Development officer VP
The Block Development officer VP
Construction of RCC Slab Culvert at BG Road Palur Colony at Pachambakkam Panchayat in Lathur Panchayat Union
2023_RDTN_301756_1
RC No.2310/2021/A9 Date.22.02.2023
Open Tender
Civil Works
Item Wise
90 days
Panchayat union office Lathur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
Yes
Panchayat union office Lathur
28 May 2023
13 Apr 2023
19 Apr 2023
13 Apr 2023
19 Apr 2023
13 Apr 2023
13 Apr 2023
Amount
Name of the Work: Construction of RCC Slab Culvert at BG Road Palur Colony @ Pachambakkam Panchayat in Lathur Panchayat Union.
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centrecomplete complying with standard specifications and as directed by departmental Officers etc.Complete.
Cement concrete 1:2:4 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
GST Amount for providing Service to Government Contract Works for the above Construction Works.{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
ARUNKUMAR ENGINEERING WORKS
A.SANTHAKUMAR
N.SRIRAMULU
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .