Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹2.5 L
EMD Value
₹25,000
Closing Date
30 Nov 2026, 12:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EE CD PWD BANSI SDR
EE CD PWD BANSI SDR
SR OF LOHRAULI TO PATEDWA LINK ROAD
2026_CEUBZ_1211579_4
1766/4A/2026 dt 07.11.2026
Open Tender
Civil Works
Percentage
60 days
EE CD PWD BANSI SDR
Please refer Tender documents.
2 documents required · 2 mandatory
₹767
₹25,000
EE CD PWD BANSI SDR
23 Nov 2026
23 Nov 2026
30 Nov 2026
23 Nov 2026
30 Nov 2026
23 Nov 2026
27 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of granular sub-base by providing Shankargarh material, spreading in uniform layers with motor grader on prepared surface and compacting in two layers at OMC with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401..(The rate are excluding G.S.T. which will be paid extra as applicable) | 7.5 | Cum | 4,000 | ₹30,000 |
| 2 | Providing, laying, spreading and compacting stone aggregates of pot holse filling with 45-63mm to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, Type - B screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.(including cost of bitumen) (The rate are excluding G.S.T. which will be paid extra as applicable) | 4.5 | Cum | 4,900 | ₹22,050 |
| 3 | Providing, laying, spreading and compacting stone aggregates of pot holse filling with 22.4-53mm to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, Type - B screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.(including cost of bitumen) (The rate are excluding G.S.T. which will be paid extra as applicable) | 4.5 | Cum | 5,000 | ₹22,500 |
| 4 | Providing and applying tack coat with Bitumen (VG-10) at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer complete as per Technical Specification Clause 503.(including cost of bitumen) (The rate are excluding G.S.T. which will be paid extra as applicable) | 60 | Sqm | 25 | ₹1,500 |
| 5 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508.(including cost of bitumen) (The rate are excluding G.S.T. which will be paid extra as applicable) | 60 | Sqm | 266 | ₹15,960 |
| 6 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510 (including cost of bitumen) (The rate are excluding G.S.T. which will be paid extra as applicable) | 60 | Sqm | 98 | ₹5,880 |
| 7 | Excavation of Foundation in ordinary soil including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the plinthincluding supply of all labour, T&P etc required for proper completion of work as per Sl No. 251(including cost of bitumen) (The rate are excluding G.S.T. which will be paid extra as applicable) | 28.46 | Cum | 120 | ₹3,415.2 |
| 8 | Concrete with 4 cm gauge approved s/b, approved coarse sand and cement in the proportion 6:3:1 in foundations and under floors including supply of all materials labour and tools and plants etc required for the proper completion of work with proper curing as per Sl. No. 280.(including cost of bitumen) (The rate are excluding G.S.T. which will be paid extra as applicable) | 7.4 | Cum | 6,500 | ₹48,100 |
| 9 | Class 150 brick work in 1:4 cement and coarse sand of 1.25 finencess modulous mortar in foundation and plinth. Including supply of all materials labour and T&P etc. required for proper completion of work with proper curing As per Sl. No. 305(B).(including cost of bitumen) (The rate are excluding G.S.T. which will be paid extra as applicable) | 6.08 | Cum | 5,100 | ₹31,008 |
| 10 | Class 150 brick work in 1:3 cement and coarse sand mortar in foundation and plinth. Including supply of all materials labour and T&P etc. required for proper completion of work with proper curing As per Sl. No. 307+309(including cost of bitumen) (The rate are excluding G.S.T. which will be paid extra as applicable) | 1.77 | Cum | 5,700 | ₹10,089 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
Tendernotice_2.pdf
PDF • 1.04 MB
BOQ_2303123.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .