| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAccepted-Finance | ₹2.7 Cr | L1 | Accepted-Finance Accepted |
| 2 | L2₹2.7 Cr+₹1.1 L (0.40%)Accepted-Finance | ₹2.7 Cr+₹1.1 L (0.40%) | L2 | Accepted-Finance Accepted |
Tender Value
₹3.2 Cr
EMD Value
₹1.8 L
Closing Date
19 Mar 2025, 12:30 pmClosed
Executive officer
Lakshmi Narasimmar Temple Parikkal
ARULMIGU LAKSHMINARASIMMASWAMY THIRUKOIL, PARIKKAL, ULUNDURPETTAI TK, KALLAKURICHI DT
2025_HRCE_521989_2
01/18.02.2024
Open Tender
Civil Works
Lump-sum
Parikkal
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹1.8 L
19 Mar 2025
18 Feb 2025
19 Mar 2025
18 Feb 2025
19 Mar 2025
18 Feb 2025
Amount
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and leveling the site, etc., complete complying with standard specification.
Supplying and filling in foundation, basement, etc with filling M sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:5:10 (One Cement, Five M sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
Supplying of Cut stone for Pillars, Pavukkal, Bothiyal, Uthiram, Kodungai of required of size etc complete.,
A)10 Feet length
B)10-14 Feet length
Providing cut stone flooring machine cutting edges 600X600mm not less than 100mm thick top surfaces dressed and pointing lime mortar including all labour charges etc complete., Single Line Dressing
Labour charges for dressing & fixing cut stone pillar of required of size including cost of labour charges etc complete scaffolding including pointing with lime mortar 1:1.5 etc complete with standards specifications.
Pillars
Bothiyals
Uthirams
Pavukkals
Kodungai
Ornamental Brick work in Lime mortor 1:2 mix using country bricks 83/4"x43/8"x23/4" all vari vargams, moulds, sthambas, mukapatram, koodu,nasi, and all ornamental brick work complete panchavarnam agaraies, karnakoodus etc forming core walls rajagopuram/vimanams complete including al labour chargers Ht 15'
Providing vargapoochu over the core walls of vimanams/Gopurams, with LIME Mortar 1:1.5 complete including Shaping the mukhapathram, mahanasi, koodu all ornamental works to proper shape by embedding broken bricks of shaped/chiseled bricks , rough plastering with LIME Mortar 1:1.5 and finishing with final ornamental plastering nayam theervani including cost and conveyance of all materials, labour there fore lifting of materials, all working in heights curing with water etc complete including all extra for folding and including clearing from the vimanams/gopurams 100 sft superficial area for kalkaram.Ht 15'
Painting two coats of newly plastered wall surface with ready mixed water based exterior emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Providing new sudhai vigrahams in the vimanams and rajagopurams with copper rod Reinforcement of suitable dia with binding wires wherever necessary, shapping the core with broken bricks set is Lime mortar 1:1.5 added 20% cement finishing the same with Lime mortar 1:1.5 added 20% cement bringing to the correct shape (lakshana) in conformist with silpa sastra inclusive of specials ornaments, weapons,peedam etc., complete and providing Lime mortor 1:1.5 added 20% cement nayam theervai wherever necessary inclusive of cost and conveyance of all materials, such as cement broken bricks, and GI rods binding wire all labour for working in heights curing lifting of materials etc., complete including panchavrana painting 2 coats over a primary coat size 2'6" to 3'6"
Weathering course with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and well watering consolidated with wooden beaters to slop including cost and conveyance of materials to site and labour charges etc complete
Finishing the top of the roof with one course of pressed tiles over a bed of LIME Mortar 1:1.5 12mm thick mixed with water proof compound at 2% b weight of cement including cost and conveyance of all materials to site and all labour charges etc complete
sub total
V.Anbukarasu (BID ID -1272837)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_626112.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .