Loading…
Loading…
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
29 Jun 2026, 3:30 pm
i) Electrical work in c/w "Construction of subway in lieu of LC gate no 8/spl at Km 286/5-6 in bet stn GGA-LLM in SBG-BGP section of Malda Division." ii) Electrical work in c/w "Construction of Subway in lieu of LC gate no 2A at Km 314/9-315/0 bet stn NAT-AKN in BGP-JMP section of Malda Division." iii) Electrical work in c/w "Construction of subway in lieu of LC gate no 2 at Km 316/7-8 in bet stn NAT-AKN in BGP-JMP section of Malda Division." iv) Electrical work in c/w "Construction of subway in lieu of LC gate no 7 at Km 325.636 in bet stn AKN-SGG in BGP-JMP section of Malda Division." v) Electrical work in c/w "Construction of subway in lieu of LC gate no 11 at Km 331.629 in bet stn SGG-GNNA in BGP-JMP section of Malda Division." vi) Electrical work in c/w "Construction of subway in lieu of LC gate no 16 at Km 351/8-9 in RPUR yard in BGP-JMP section of Malda Division." vii) Electrical work in c/w "Construction of subway in lieu of LC gate no 16/spl at Km 361/6-7 in bet stn JMP-DRTP in BGP-JMP section of Malda Division." viii) Electrical work in c/w "Construction of subway in lieu of LC gate no 17/spl at Km 362/7-8 in bet stn JMP- DRTP in JMP-KEU section of Malda Division." ix) Electrical work in c/w "Construction of subway in lieu of LC gate no 23 at Km 377/9-378/0 in bet stn MSDN-AHA in JMP- KEU section of Malda Division." x) Electrical work in c/w "Construction of subway in lieu of LC gate no 26 at Km 382/6-7 in bet stn AHA-KJH in JMP-KEU section of Malda Division." xi) Electrical work in c/w "Construction of subway in lieu of LC gate no 27/spl at Km 386/4-5 in bet stn AHA-KJH in JMP-KEU section of Malda Division." xii) Electrical work in c/w "Construction of subway in lieu of LC gate no 34/spl at Km 400/0-1 in bet stn DNRE-KEU in JMP-KEU section of Malda Division." xiii) Electrical work in c/w "Construction of subway in lieu of LC gate no 29 at Km 41/14-15 in bet stn BHLB-PJLE in BGP-MDLE section of Malda Division."
EL-MLDT-E-TENDER-433
EL-MLDT-E-TENDER-433
Open
6 Months
Maldah, West Bengal
₹0
₹2.8 L
5 Jun 2026
5 Jun 2026
15 Jun 2026
in bet stn BHLB-PJLE in BGP-MDLE section of Malda Division."
Item- 1 Please see in break-up item
S No. Item Description of Item Unit Qty Rate Amount
1 1 Supply, fixing & commissioning of 3 inch UPVC pipe Metre 150.00 43.55 6532.50
with T-joint, elbow joint, Ball valve, etc. other
necessary accessories for water suction and
2 2 Supply and commissioning of 3 inch PVC foot valve Numbers 2.00 143.07 286.14
3 3 Supply of premium quality 3 Inch (75 mm) PVC Metre 10.00 310.00 3100.00
4 4 Supply of LDPE 3 inch (7.62 cm) Lapeta Pipe for Foot 30.00 6.42 192.60
delivery purpose.
5 5 Supply of Hose clamp 3 inch stainless steel. Set 6.00 95.00 570.00
6 6 Supply, fixing and connection of 3 HP single phase Set 2.00 30423.00 60846.00
sewage submersible pump.
7 7 Supply, fixing, connection and testing of 3 HP DOL Set 2.00 4153.99 8307.98
8 8 Supply and fixing of WIRELESS PUMP CONTROLLER Numbers 2.00 31860.00 63720.00
1000 GSM 1) Supply of 4G pump controller for
operation status with installation & testing for
pump control motor set 2) The available voltage at
the site Pump load (current) 3) Motor ON/OFF
status with real-time 4) Power ON/OFF status as
feedback to customers through app. 5) The pump
can be operated from anywhere through mobile. 6)
In-built delay on timer, Cyclic timer, RTC timer,
Maximum run timer, water level sensor 7)
Adjustable voltage & current settings. User
Programmable timer settings. 8) LCD display
indication. 9) Interface unit. 10) 2 year of GSM SIM
maintenance charge
9 9 Supply, fixing and connection of 60W highbay light Set 18.00 5888.61 105994.98
10 10 Wiring of light /lamp/fan/exhaust points through Numbers 12.00 338.00 4056.00
PVC casing and capping.
11 11 Extra cost for concealed wiring for light Numbers 12.00 87.13 1045.56
/fan/exhaust/wall fan point.
12 12 Supply, fixing & connection of ceiling rose (6A) for Numbers 40.00 29.71 1188.40
light/fan/exhaust/wall fan point
13 13 Wiring of sub-main line 4 sq mm Phase & neutral. Metre 200.00 160.26 32052.00
14 14 Wiring of sub-main line Phase & neutral through Metre 250.00 141.75 35437.50
MALDA DIVISION-ELECTRICAL/EASTERN RLY
15 15 Wiring of Main line 6 mm sq Phase & neutral. Metre 35.00 170.57 5969.95
16 16 Extra cost for concealed of Main/sub main Metre 200.00 45.74 9148.00
line1.5/4/6 sq mm.
17 17 Supply, fixing and connection of LED 16W fittings Numbers 20.00 3376.27 67525.40
suitable for Pit/ under Cat walk light operating
voltage (40-72V) AC as per specification.
18 18 Supply and fixing of SS cage of size min (15.5" x 6" Set 20.00 273.13 5462.60
x 4") or as per site made with SS angle frame and
SS wire mesh for covering the pit light.
19 19 Supply of power supply unit 3KVA for pit light as Set 2.00 17850.73 35701.46
per specification.
20 20 Fixing and connection of power supply unit Set 2.00 191.78 383.56
(Louvolite transfomer) at site location.
21 21 Supply and fixing of enclosure of size min (L X W X Set 2.00 6110.53 12221.06
D/2 ' x 3' X 2.5' ) MS original sheet enclosure of 14
SWG with inside & outside anticorrosive ISI brand
paint and hinged door to be kept on min 3 feet
height tool made with MS angle ( 76 x6) mm
placing of power supply unit (Louvolite
22 22 Supply & fixing of LED tube light fitting complete Numbers 4.00 412.76 1651.04
set 20W (Aluminum housing)
23 23 Supply, fixing & connection of LED 9W bulb with Numbers 2.00 148.36 296.72
angular holder.
24 24 Supply, fixing and connection of BLDC fan 1200 Numbers 2.00 3289.30 6578.60
25 25 Supply, fixing & commissioning of 5 Meters length Set 14.00 15153.69 212151.66
GI octagonal pole with channel bracket of 1500
mm long suitable for fixing of flood light with all
accessories with necessary RCC foundation.
26 26 Supply, fixing and connection of LED street light Numbers 16.00 4105.61 65689.76
45W (48V-70V AC)
27 27 Supply and fixing of G.I. Pipe heavy gauge size Numbers 4.00 177.11 708.44
1.25 inch dia 2.5 ft. long as per site requirement
including 2 sets of M.S clamps.
28 28 Wiring of 5 pin 5A plug point (as per IS 694:1990) Numbers 4.00 208.76 835.04
& ECC of size 18 SWG copper wire including supply
29 29 Surface wiring of 5/15A combined plug points Numbers 4.00 280.30 1121.20
through PVC casing & capping PVC insulated,
single core, multi stranded, unsheathed, copper
conductor of size 4 mm sq. (as per IS 694: 1990) &
ECC of size 16 SWG copper wire including supply of
all materials with plug socket, switch, etc.
30 30 Extra cost for concealed of 5 pin 5A/5-15A plug Numbers 8.00 48.00 384.00
31 31 Supply, fixing & connection of SPN, 2 way MCB Numbers 2.00 172.00 344.00
sheet steel 18 SWG original enclosure, (18-20
micron) powder painted.
32 32 Supply, fixing & connection of SP MCB of 16A on Numbers 2.00 211.80 423.60
MCB Distribution board.
33 33 Supply, fixing & connection of SPN 6 way (No of Numbers 1.00 4691.99 4691.99
module 6+2) MCB sheet steel Distribution Board
with metal door Including i) Supply of 4 nos SP
MCB (6-32A) ii) 01 no RCCB 32/40A (100mA)
including all wiring.
35 35 Supply, fixing, and connection of Bus-bar Chamber Set 1.00 4250.12 4250.12
4 way of Cap-63A wall mounted including
connection of LT cable with proper lugs and cable
36 36 Supply, installation, commissioning & testing of Numbers 5.00 2840.98 14204.90
earthing as per IS:3043 or latest amendment.
MALDA DIVISION-ELECTRICAL/EASTERN RLY
25 mm X 6 mm or 50 mm X 6 mm for laying from
earth pipe to transformer/body LT & HT panel/pole
etc for earth connectivity as per site.
38 38 Cable trenching, laying, back filling & Connection Metre 450.00 252.94 113823.00
of LT cables as per IS-1255, 1983 or latest.
39 39 Cable laying through pole/wall/floor as per site Metre 350.00 41.54 14539.00
requirement as per IS- 1255, 1983 or latest.
40 40 Supply & laying of 3'' dia medium gauge ISI brand Metre 50.00 684.32 34216.00
heavy duty G.I. pipe for LT cable Track crossing
and road crossing for rising of cable.
41 41 Dismantling of wiring including fittings and street Man- 2.00 1403.00 2806.00
42 42 Dismantling of Rail/Tubular pole/Octagonal pole Numbers 4.00 735.75 2943.00
complete with foundation, MS bracket, nut bolts,
ACSR etc and all released materials shall be
carried out and handed over to Sr. S.E.E(G) MLDT
store with proper acknowledgement.
43 43 Supply, fixing and connection of Timer Consisting Set 1.00 8643.70 8643.70
of Below materials with Complete wiring- 1) MCB
32A 2P -01 set (Incoming) 2) Contactor 32A 2P
(coil voltage-240V) -01 set 3) Digital Time Switch-
01 set 4) SP MCB-16A-02 set 5) SPN DB with metal
door 8 (2+6) way-1 set with all wiring connection.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
433SpecificationofWorksAnnexureA.pdf
ATTACHMENT
433OtherTenderConditionsAnnexure-F.pdf Other Tender conditions
ATTACHMENT
Checklist.pdf
ATTACHMENT
Technicalcompliances.pdf
ATTACHMENT
CommercialCompliances.pdf
ATTACHMENT
Othercompliances.pdf
ATTACHMENT
TenderDocuments-2022MLDT.pdf
ATTACHMENT
Mandatorydocumentslist.pdf
ATTACHMENT
BGFormatforBidSecurity.pdf
ATTACHMENT
LetterofcreditformatAnnexure-B.pdf
ATTACHMENT
MandatoryupdationLabourdataAnnexC.pdf Labour Data Annexure C
ATTACHMENT
Deployment of Qualified Engineer
ATTACHMENT
GCC-2022uptoACS11.pdf
ATTACHMENT
MandatoryupdationLabourdataAnnexC.pdf
ATTACHMENT
Deploymentofqualifiedengineer-Annexure-_E_.pdf
ATTACHMENT
433OtherTenderConditionsAnnexure-F.pdf
ATTACHMENT
Download all tender documents and submit your bid