Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.5 LAdmitted-Finance | -5.50% | ₹4.5 L | L1 | Admitted-Finance |
| 2 | L2₹4.7 L+₹14,061.53 (3.10%)Admitted-Finance AT BARIMAL PO HATIBARI PS SUKINDA DIST JAJPUR PIN 755018 | JAJAPUR | ODISHA | 755018 | -2.57% | ₹4.7 L+₹14,061.53 (3.10%) | L2 | Admitted-Finance |
Tender Value
₹4.8 L
EMD Value
₹9,600
Closing Date
1 Apr 2026, 2:00 pmClosed
AGM CE
FCI RO BHUBANESWAR
Construction of Female Toilet, Renovation of Male Toilet and Old weighbridge room at FSD Kesinga ........ 2nd call.
2026_FCI_903204_2
NIT- 09(A)/2025-26
Open Tender
Civil Works
Percentage
60 days
FCI FSD KESINGA
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,600
5 May 2026
21 Mar 2026
2 Apr 2026
21 Mar 2026
1 Apr 2026
21 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | |||||
| 2Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles 10 mm to 25 mm | |||||
| 3Dismantling wall tile laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles 10 mm to 25 mm | |||||
| 4Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | |||||
| 5Brick work with clay flyash F.P.S. (non modular) brick of class designation 7.5 in superstructure above plinth level up to floor five level in : Cement mortar 1:6 (1 cement : 6 coarse sand) | |||||
| 6Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | |||||
| 712 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand) | |||||
| 8Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. | |||||
| 9Distempering with 1st quality acrylic distemper (ready mix) having VOC content less than 50 grams/ litre of approved manufacturer and of required shade and colour all complete to achieve even shade and colour : New work (two or more coats) over and including water thinnable priming coat with cement primer having VOC content less than 50 gram/litre | |||||
| 10Renewing glass panes, with wooden fillets wherever necessary: Float glass panes of nominal thickness 4 mm (weight not less than 10kg/sqm | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.20 MB
BOQ_949367.xls
BOQ • 0.37 MB
MTF_Kesinga_Toilet_merged.pdf
Tender Documents • 1.72 MB
corr9A.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .