| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAccepted-AOC | ₹3.1 Cr | L1 | Accepted-AOC first lowest |
| 2 | L2₹3.2 Cr+₹13.6 L (4.42%)Rejected-Finance NAN | ₹3.2 Cr+₹13.6 L (4.42%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.9 Cr+₹86.7 L (28.2%)Rejected-Finance | ₹3.9 Cr+₹86.7 L (28.2%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical document incomplete |
| 5 | Rejected-Technical | - | - | Rejected-Technical document incomplete |
Tender Value
Refer Docs
EMD Value
₹7.9 L
Closing Date
3 Jan 2025, 3:00 pmClosed
SE ICC MAHOBA
OFFICE OF THE SE ICC BAZARIYA MAHOBA
Restoration of Chaudhri Charan Singh Charkhari dal nahar in between km 13.000 to km 20.000
2024_UPIDC_968786_2
09/SE/2024-25
Open Tender
Civil Works
Item Rate
240 days
MAHOBA
AS PER NIT AND TENDER DOCUMENTS
2 documents required · 2 mandatory
₹7,365
₹7.9 L
17 Mar 2025
24 Dec 2024
3 Jan 2025
24 Dec 2024
3 Jan 2025
24 Dec 2024
Amount
Jungle Clearance cutting heavy under growth and bushes upto 7.50 cm diameter with collection and removal of roots with collection & Removal including all cost of material, labour, T&P etc. complete.
Dismantaling R.C.R. or cement concrete/ brick in floor and wall including stacking of dismantled material with in a distance of 60m. Including all cost of material labour T&P etc.
Earth work in foundation of walls, piers, abutments etc.with disposal with in 30-m lead and 1.5 m. lift. in Mar, Kabar and Rankar soil.
Earth work in Excavation including all cost of labour material T&P etc.
Earth Work in filling in Mar, Kabar, Ranker & Kanker Mixed Soil with all lead and lift including all cost of material labour T&P etc.
Coarse Sand including all cost of labour material T&P etc.
P.C.C. 1:3:6 nominal mix including all cost of labour material T&P etc.
Centering and shuttering for P.C.C. work including of cost of shuttering. material and T & P etc. required. for proper completion of work.
Centering and shuttering for R.C.C. work including of cost of shuttering. material and T & P etc. required. for proper completion of work.
Steel reinforcement including cutting, beding, binding and placing for proper completion of work.
Laying R.C.C. 1:1.5:3 nominal mix by mechanical mixing. including cost of all material, labour and T&P etc. all leads and lifts for proper completion of job as per direction of Engineer-in-charge.
C.C. 1:1.5:3 (200x150)mm Nominal Mix including all cost of labour material T&P etc.
C.C. 1:2:4 Nominal Mix including all cost of labour material T&P etc.
Providing and fixing P.V.C. pipe 75 MM dia including all cost of material, labour and T&P etc. complete of work.
Providing and Laying with stone boulders pitching of minimum size and weight less than 25 Kg. laid dry complete as per drawing and technical specifications.
Supplying and laying of 900mm dia. R.C.C. hume pipe including all Carriage, loading, unloading, material, labour, T&P etc. complete of work.
Prepration of subgrade excluding cost of earth work.
C.C. Lining 1:1.5:3 Nominal Mix including all cost of labour material T&P etc.
Laying 125 micron polythene sheet including all cost of labour material T&P etc.
Construction Joint of C.C. Lining with bitumen sealing compound including all cost of labour Material T&P etc.
Laying Two Coat of Bitumen sealing compond on top of sleepers of C.C. Lining works including all cost of labour material T&P etc.
R.C.R. Masonary including all cost of labour material T&P etc.(Reusable dismantled material cut stone boulder from iteam No. 2 shall be used up to 20 % from dismantaled quantity. If dismantaled material found more than 20% usable be taken on stock as par direcetion of Engineer-in-Charge.)
Struck Pointing (Raised or Struck Deep on Stone masonry in Cement or lime) including all cost of labour material T&P etc.
Cement Plaster with 1:3 Cement Mortar (cement and Coarse sand) 6mm thick including all cost of material, labour, T&P etc. complete.
Painting Two coat on wall including scraping old paint & cost of all material, labour and T&P required for proper finish of work.
Removal of Saturated (excluding cost of dewatering) in Mar, Kabar and ranker soil with all lead and lift including all cost of material, labour, T&P etc. complete.
M/s Bajrang Construction & Suppliars (BID ID -4831228)
M/S VIVEK KUMAR SINGH (BID ID -4831279)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .