Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.4 L+₹20,210.57 (9.03%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.5 L+₹30,092.07 (13.5%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹2.5 L+₹30,692.74 (13.7%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹2.8 L+₹61,094.95 (27.3%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹3.9 L
EMD Value
₹7,840
Closing Date
3 Aug 2026, 6:00 pmClosed
Executive Engineer, REW Jammu
Office of the Executive Engineer, REW Jammu
Constt. Of 2 no culvert near H/O Jagdish Raj and Land of Master yash paul 3,4 lakh Pyt mattoo block khour under PRI CAPEX BUDGET for the Year 2026-27
2026_RDPR_316888_11
e-NIT No. 195 REWJ of 2026-27 dated 18-07-2026
Open Tender
Civil Works
Percentage
Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
MH0515
₹7,840
21 Aug 2026
20 Jul 2026
4 Aug 2026
20 Jul 2026
3 Aug 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil : | 10.2 | cum | 479.3 | ₹4,888.86 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with1:5:10 (1 cement : 5 coarse sand : 10 Graded stone aggregate 40 mm nominal size) | 1.12 | cum | 4,826.5 | ₹5,405.68 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 20.56 | cum | 5,733.6 | ₹1,17,882.82 |
| 4 | Supply and filling of stones | 7.9 | CUM | 700 | ₹5,530 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 11.21 | cum | 7,788.4 | ₹87,307.96 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level | 1,121.5 | kg | 123.2 | ₹1,38,168.8 |
| 7 | Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 32.93 | mtrs | 262.2 | ₹8,634.25 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 33.46 | sqm | 286.35 | ₹9,581.27 |
| 9 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 6.12 | cum | 276.6 | ₹1,692.79 |
| 10 | Sand within avg lead 10 km by MT | 14.93 | cum | 279.04 | ₹4,166.07 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_1036166.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .