Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹20.3 LAdmitted-Fee/PreQual/Technical/Finance AT RANIGUDA FIRM 4TH LANE POST RAYAGADA BLOCK RAYAGADA PIN 765001 | RAYAGADA | RAYAGADA | ODISHA | 765001 | +0.00% | ₹20.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹20.3 LAdmitted-Fee/PreQual/Technical/Finance BEHERA | NA | NA | 121004 | +0.00% | ₹20.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹20.3 LAdmitted-Fee/PreQual/Technical/Finance AT PO SIKAPAI KASHIPUR DIST RAYAGADA | KASHIPUR | RAYAGADA | ODISHA | +0.00% | ₹20.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹20.3 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹20.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹20.3 LAdmitted-Fee/PreQual/Technical/Finance AT RANIGUDA FIRM 4TH LANE POST RAYAGADA BLOCK RAYAGADA PIN 765001 | RAYAGADA | RAYAGADA | ODISHA | 765001 | +0.00% | ₹20.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹20.3 L
EMD Value
₹20,400
Closing Date
29 Jun 2026, 5:00 pmClosed
Divisional Officer
ROADS AND BUILDINGS DIVISION, RAYAGADA
Construction of Panchakarma Hall building in D.A.M.O at Rayagada for the year 2025-26
2026_EICCL_131963_1
RGD 02/2026-27
Open Tender
Civil Works - Buildings
Percentage
150 days
Rayagada
2 documents required · 2 mandatory
₹6,000
₹20,400
Yes
3 Jul 2026
12 Jun 2026
30 Jun 2026
12 Jun 2026
29 Jun 2026
12 Jun 2026
12 Jun 2026 - 29 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Ground Floor
Earth work in foundation in hard soil or gravelly soil within 50m intial lead and lifts 1.5 M intial lifts including dressing and leveling the bed and depositing the excavated earth at places away from work site including cost of all labour, T and P and dewatering if required for the work etc. complete as per drawing and Technical specification and as directed by the Engineer-in-Charge. | 46.14 | cum | 276.89 | ₹12,775.7 |
| 2 | Supplying and filling in foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceeding 23 cm. in depth with all lead and lift including cost, conveyance, royalties and taxes of all materials, cost of all labour, sundries, T and P required for the work etc. complete in all respect as per direction by the Engineer-in-charge. | 53.66 | cum | 651.32 | ₹34,949.83 |
| 3 | Providing and laying (1:3:6) in foundation and floors using 4 cm. size black hard crusher broken granite stone metal and sand of approved quality and from approved quarry including laying concrete in layers not exceeding 15cm in depth, ramming, watering and curing etc. complete to required levels including cost, conveyance, royalties, taxes of all materials and cost of all labours, T and P etc complete as per the direction of the Engineer in charge. | 10.42 | cum | 5,648.11 | ₹58,853.31 |
| 4 | Fly ash brick masonry in cement mortar (1:6) using bricks of 23cm size having a crushing strength of not less than 75 kg per Sq.cm, after immersing Bricks for six hours in waters before use with watering, curing etc. complete including cost, conveyance, royalties, taxes of all materials, cost of all labour, all T and P etc. complete in all respect as directed by the Engineer-in-charge.
Foundation & Plinth | 11.16 | cum | 5,528.59 | ₹61,699.06 |
| 5 | Fly ash brick masonry in cement mortar (1:6) using bricks of 23cm size having a crushing strength of not less than 75 kg per Sq.cm, after immersing Bricks for six hours in waters before use with watering, curing etc. complete including cost, conveyance, royalties, taxes of all materials, cost of all labour, all T&P etc. complete in all respect as directed by the Engineer-in-charge.
Superstructure | 19.6 | cum | 5,561.92 | ₹1,09,013.63 |
| 6 | Fly ash brick masonry in cement mortar (1:6) using bricks of 23cm size having a crushing strength of not less than 75 kg per Sq.cm, after immersing Bricks for six hours in waters before use with watering, curing etc. complete including cost, conveyance, royalties, taxes of all materials, cost of all labour, all T and P etc. complete in all respect as directed by the Engineer-in-charge.
Superstructure | 3.98 | cum | 5,561.92 | ₹22,136.44 |
| 7 | RCC work of M-20 grade in the Structural building works using 20mm to 10mm down graded hard black granite Crusher broken aggregates of approved quality from approved quarry including all taxes in complete
A) Footing Column | 9.5 | cum | 6,186.94 | ₹58,775.93 |
| 8 | B) Plinth Band | 6.18 | cum | 7,054.97 | ₹43,599.71 |
| 9 | C) Column/ Roof Beam | 11.56 | cum | 17,837.92 | ₹2,06,206.36 |
| 10 | D) Roof Slab | 9.46 | cum | 13,435.88 | ₹1,27,103.42 |
stage.html
html • 0.06 MB
finance_596295.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.55 MB
Tendernotice_2.pdf
PDF • 1.15 MB
Tendernotice_3.pdf
PDF • 0.22 MB
BOQ_596295.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .