Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-Finance LUDHIANA | L1 | Accepted-Finance due to lower side rates | |
| 2 | L2₹2.6 L+₹11,102.01 (4.44%)Rejected-Finance | L2 | Rejected-Finance due to higher side rates | |
| 3 | L3₹3.2 L+₹74,137.78 (29.7%)Rejected-Finance | L3 | Rejected-Finance due to higher side rates |
Tender Value
Refer Docs
EMD Value
₹7,300
Closing Date
4 Jun 2021, 5:00 pmClosed
The Executive Officer
Municipal Council Mehatpur Basdehra Distt Una HP
C/o covered nallah balance work from H/o Dr. Kewal towards H/o Sh. Mula Singh in ward No. 04 and 05, MC Mehatpur-Basdehra, Distt. Una HP.
2021_UDDHP_47884_1
MCMB/Works/2021-518-521 dated 28.05.2021
Open Tender
Civil Works - Others
Item Rate
30 days
ward 4 and 5
Please refer Tender documents.
7 documents required · 7 mandatory
₹350
EO MC Mehatpur Basdehra
₹7,300
5 Jun 2021
29 May 2021
5 Jun 2021
29 May 2021
4 Jun 2021
29 May 2021
Amount
Demolition of brick work below G.L. upto 1.5Metres depth including stacking of serviceable materials and disposal of un-serviceable materials within 20 metres lead. In cement mortar
Excavation in foundation trenches etc.in earth work ,lift upto 1.50 mtrs,stacking the excavated soil not more than three mtrs clear from the edge of excavation and then returning the stacked soil in 15 cm layers when required into the plinth and sides of foundations etc. ( P.J. work ) including dressing of side and bed
P/L c.conc.1 : 4 : 8 (1 cement : 4 sand : 8 graded stone aggregate of 40 mm nominal size ) and curing complete excluding the cost of form work in foundation and plinth .
Providing form work with steel plates 3.15mm.thick welded with angle iron in frame 30x30x5mm. so as to give a fair finish including centring, shuutering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 Mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in :- Vertical surfaces
Flat surfaces such as soffits of suspended floors, roofs, landings and the like.Floors etc.upto 200mm. in thickness.
Edges of slab/breaks in fllors.
P /L cement conc. 1 : 2 : 4 ( 1 cement : 2 sand : 4 graded stone aggregate of 20 mm nominal size ) and curing complete excluding the cost of form work in :-foundation and plinth
Walls including attached buttresses,pilasters and their caps and basis and string courses etc. upto floor two level
Suspended Floor roofs, landing and shelves and their support balconies,beams,girders,bressumers and contilever upto floor twolevel
Providing tor steel reinforcement for RCC work including bending, binding and placing in position properly.
Disposal of un serviceable materials by mechanical transportation up to a lead of 3.00 km including loading, un-loading complete.
aman kumar
Ankush Kaushal Govt Cont
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .