Loading…
Loading…
Tender Value
₹29.1 L
EMD Value
₹1.5 L
Closing Date
8 Sept 2026, 3:00 pm3d left
CE LDA
CE, LDA
MALLAHI TOLA PRATHAM WARD KE ANTARGAT JANRELGANJ STHIT RAM GOPAL SHARMA KE GHAR SEY VINAY JAISWAL KE GHAR HOTE HUYE ANAND TRIPATHI TAK ROAD AND NALI KA NIRMAN KARYA
2026_LDAUP_1181123_1
95/E-NIVIDA/CE/2026-27
Open Tender
Civil Works
Fixed-rate
120 days
LDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,950
SECRETARY LDA
₹1.5 L
Yes
1 Sept 2026
1 Sept 2026
9 Sept 2026
1 Sept 2026
8 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m., All kinds of soil. | 183.6 | Cum | 205.62 | ₹37,751.83 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 107.1 | Cum | 5,381.16 | ₹5,76,322.24 |
| 3 | Mild steel or iron work in plain work such as in R.C.C. or R.B. (when not included in an over all rates ) including bending for proper completion of the work and including supply of steel and its wastage , bends, hooks and authorised overlaps shall be measured up to floor two level. (SI No. 504) (Sanction Rate) | 8,347.3 | Kg | 71.5 | ₹5,96,831.81 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings. bases of columns, etc. for mass concrete (PWD SOR 5.9.1/2023) @309.78 | 102 | Sqm | 309.78 | ₹31,597.56 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :, 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 175.95 | Cum | 7,145.72 | ₹12,57,289.43 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for :, Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 612 | Sqm | 665.54 | ₹4,07,310.48 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.48 MB
td.pdf
Tender Documents • 1.13 MB
BOQ_2220659.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .