Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38 LAccepted-AOC FLAT NO 13 MANGALAM CHAMBERS PAUD ROAD KOTHRUD PUNE PUNE MAHARASHTRA 411038 | PUNE | MAHARASHTRA | 411038 | L1 | Accepted-AOC Contract Value 3800000 plus 18 percent GST OPEL Lifts Pvt Ltd L1 | |
| 2 | L2₹46.8 L+₹1.4 L (2.97%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹55.9 L+₹10.5 L (23.1%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
27 Jul 2022, 5:00 pmClosed
Officiating Director College of Engineering Pune
Office, College of Engineering Pune
Recall for Tender inviting for Elevators at Metallurgy Workshop Mechanical Drawing Hall and 3D Laboratory Production Engineering Department COEP
2022_DTEDM_819759_1
COEP/PEC/Elevator/2022/29
Open Tender
Civil Works - Others
Item Rate
60 days
College of Engineering Pune
As per Tender Document
2 documents required · 2 mandatory
₹6,000
Yes
₹60,000
Yes
23 Sept 2022
21 Jul 2022
29 Jul 2022
21 Jul 2022
27 Jul 2022
21 Jul 2022
SITC of Hydraulic Passenger Lift at Metallurgical Workshop
Supplying, Installing, Testing, Commissioning including applying and obtaining approvals, clearances, NOC's from all concerned statutory authorities [which will make the entire system as complete and functional and prove the practical results as per the design guidelines and product specifications to the Clients, Project Architects, Project Architects Sub-Consultants and Construction Management Consultants] with all lead and lifts, all levels: (including SS frame as per design and specifications) but limited to foundation buffers, electrical supply points and distribution and other civil foundations required . The structural safety of the SS frame should be certified by the appropriate agency /person. Passenger Elevator ] Metallurgical Workshop Unit Rate (Rs.) (Supply + Installation) Including Comprehensive Maintenance Contract after completion of 36 months from the date of successful running of the elevator (handing over date to the Client). Comprehensive means Inclusion of all required materials, parts, systems, consumables, labour etc. complete
SITC of Hydraulic Passenger Lift at Mechanical Drawing Hall
Supplying, Installing, Testing, Commissioning including applying and obtaining approvals, clearances, NOC's from all concerned statutory authorities [which will make the entire system as complete and functional and prove the practical results as per the design guidelines and product specifications to the Clients, Project Architects, Project Architects Sub-Consultants and Construction Management Consultants] with all lead and lifts, all levels: (including SS frame as per design and specifications) but limited to foundation buffers, electrical supply points and distribution and other civil foundations required . The structural safety of the SS frame should be certified by the appropriate agency /person. Passenger Elevator ] Mechanical Drawing Hall Unit Rate (Rs.) (Supply + Installation) Including Comprehensive Maintenance Contract after completion of 36 months from the date of successful running of the elevator (handing over date to the Client). Comprehensive means Inclusion of all required materials, parts, systems, consumables, labour etc. complete
SITC of Hydraulic Passenger Lift at 3D Laboratory in Production Engineering Department
Supplying, Installing, Testing, Commissioning including applying and obtaining approvals, clearances, NOC's from all concerned statutory authorities [which will make the entire system as complete and functional and prove the practical results as per the design guidelines and product specifications to the Clients, Project Architects, Project Architects Sub-Consultants and Construction Management Consultants] with all lead and lifts, all levels: (including SS frame as per design and specifications) but limited to foundation buffers, electrical supply points and distribution and other civil foundations required . The structural safety of the SS frame should be certified by the appropriate agency /person. Passenger Elevator ] 3D Laboratory in Production Engineering Department Unit Rate (Rs.) (Supply + Installation) Including Comprehensive Maintenance Contract after completion of 36 months from the date of successful running of the elevator (handing over date to the Client). Comprehensive means Inclusion of all required materials, parts, systems, consumables, labour etc. complete
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .