| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.0 LAccepted-AOC | ₹2.0 L | 1 | Accepted-AOC Accepted |
| 2 | 2₹2.3 LRejected-AOC | ₹2.3 L | 2 | Rejected-AOC O.k. |
| 3 | 3₹2.4 LRejected-AOC | ₹2.4 L | 3 | Rejected-AOC O.K. |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
7 Jun 2022, 5:00 pmClosed
Superintending Engineer
Superintending Engineer Transmission Campus Near L.I.C. Office Rampur Garden, Bareilly
Replacement of missing Tower Parts at 132KV Usawan-Tilhar S.C. Transmission Line alongwith other associated works under Electy. Transmission Division, Budaun
2022_UPTCL_705100_1
Short Term E-Tender No. 04/W/ETC(B)/2022-23
Open Tender
Electrical Works
60 days
Budaun
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE ETC BAREILLY
₹2,000
17 Sept 2022
1 Jun 2022
8 Jun 2022
1 Jun 2022
7 Jun 2022
1 Jun 2022
Amount
Replacement of missing Tower Parts at 132KV Usawan-Tilhar S.C. Transmission Line alongwith other associated works under Electy. Transmission Division, Budaun with all cost of men, misc. consumables, normal & special T&P, welding machine etc required to be arranged by agency for satisfactory completion of the work, with all due care of safety & precautions as per technical specifications and direction of the supervising engineer, as per details below :
Replacement of Tower Part in Place of Missing Ones after due Fabrication of Tower Parts as per Sample from off sizes G.I. Angles to be Provided by the Department as per Requirement by due Cutting. Drilling etc, and then, Fixing the same at Required Places at different Tower Locations of above 132KV Transmission Lines with Proper Tightening & Chamfering etc. including Transportation of G.I. Angles.
Tack welding of all the bolts up to the height of one section of the tower or 5 meter from ground level whichever is higher with three tacks at 1200seperation of minimum 10mm thickness with 10mm/12mm electrode & application of Zinc rich Aluminium paints on the affected surface including cost of all material including tack welding of River Crossing tower & Anchor towers.
Shaurya Shakti Enterprises
M/s Abhinav Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf