Tender ID
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.0 L+₹1,981.77 (1.00%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.1 L+₹7,927.07 (4.00%)Admitted-Finance BELGHARIA KOLKATA WEST BENGAL 700056 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700056 | L3 | Admitted-Finance |
Tender Value
₹2.0 L
EMD Value
₹3,964
Closing Date
6 Mar 2026, 4:00 pmClosed
EXECUTIVE ENGINEER (S AND D)
4, M.G. ROAD, HOW-1
Construction of drain cover slab from 51/1 to 51/4, COWIES GHAT ROAD (BACK SIDE),at ward no-36, under HMC ,APAS Fund, Scheme No.-APAS/01/171/258/0003
2026_MAD_1016551_60
WB-HMC/TN/ED/SANDD/ 76 /2025-2026
Open Tender
CIVIL WORKS
Percentage
20 days
HMC AREA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹3,964
15 Mar 2026
28 Feb 2026
9 Mar 2026
28 Feb 2026
6 Mar 2026
28 Feb 2026
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety [Ref: P.W.D (Bldg) 2017, Page-26 Item No- 10] Analysis no-23.
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. [P.W.D.(Bldg.). Page- 42, Item - 36.(a)]
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel [Ref : P.W.D.(Bldg.), Page-43, Item No. 40]
Add 18% GST
Add 1% Cess
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
Tendernotice_2.pdf
PDF • 6.13 MB
BOQ_2498271.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .