| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.4 LAccepted-AOC | ₹12.4 L Quoted ₹13.7 L | L1 | Accepted-AOC AOC ISSUED WITH NEGOTIATED RATE TO L1 BIDDER |
| 2 | L2₹14.0 LRejected-Finance | ₹14.0 L | L2 | Rejected-Finance L2 |
| 3 | L3₹14.3 LRejected-Finance | ₹14.3 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | PLIANT CONSTRUCTION PRIVATE LIMITED L1 | V PARAMESWARI L3 | JVS CONSTRUCTIONS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Labour Charges for Dismantling the existing old R.R. Masonary mud Compound Wall and removing "Y" Angle in the old compound wall and Disposing the Stacking the Materials as directed by dept officers etc complete. | 70 | M3 | 303 ₹21,210 | 317 ₹22,190 | 309 ₹21,630 |
| 2.00 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 11.5 | M3 | 235 ₹2,702.50 | 246 ₹2,829 | 240 ₹2,760 |
| 3.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid) | 52.5 | M2 | 998 ₹52,395 | 1,044 ₹54,810 | 1,016 ₹53,340 |
| 4.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | 26 | M2 | 1,109 ₹28,834 | 1,161 ₹30,186 | 1,130 ₹29,380 |
| 5.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 1,990 | kg | 96 ₹1.9 L | 101 ₹2.0 L | 98 ₹2.0 L |
| 6.00Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three crushed stone Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | ||||||
| 6.10 | foundation and Basement | 11.5 | M3 | 9,594 ₹1.1 L | 10,042 ₹1.2 L | 9,773 ₹1.1 L |
| 6.20 | ground floor up to 4.50 m height | 5 | M3 | 9,735 ₹48,675 | 10,190 ₹50,950 | 9,917 ₹49,585 |
| 7.00Brick work in fCement Mortar 1:5 using best quality Burnt Clay Brick of size 9" x 4 3/8" x 2 3/4" with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement,ground floor,every upper floor including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Departmental Officer in charge. | ||||||
| 7.10 | ground floor up to 4.50 m height | 42 | M3 | 7,792 ₹3.3 L | 8,156 ₹3.4 L | 7,938 ₹3.3 L |
Updated dates
Tender Value
Refer Docs
EMD Value
₹13,500
Closing Date
30 Dec 2025, 3:00 pmClosed
DM CIVIL CORP
DM CIVIL CORP TNSTC MADURAI LTD BYE PASS ROAD MADURAI 625016
Revamping compound wall at virudhunagar Depot Virudhunagar Region TNSTCMADURAI
2025_TNSTC_627535_1
TS02VNR
Open Tender
Civil Works
VIRUTHUNAGAR
AS MENTIONED IN SCHEDULE
3 documents required · 3 mandatory
₹0
₹13,500
14 Mar 2026
29 Nov 2025
31 Dec 2025
29 Nov 2025
30 Dec 2025
29 Nov 2025
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
foundation and Basement
ground floor up to 4.50 m height
ground floor up to 4.50 m height
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three Plastering Sand) 10mm thick including mortar plasticizer at 200ml per 50Kg of cement used , hacking the surfaces and curing, etc., in all floors complying with standard specification and as directed by the departmental officers
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Supplying and fixing of Barbed wire fencing including cost of binding wire etc. complete as per standard specifications and as directed by the departmental officers.
Basic total
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_750246.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid