Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | - | Rejected-Technical AS per TCR | |
| 3 | Rejected-Technical DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | - | Rejected-Technical AS per TCR |
Tender Value
₹5.8 L
EMD Value
₹7,300
Closing Date
2 Aug 2022, 10:00 amClosed
Area Engineer (EandM)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Burdwan, West Bengal-713346
Extension of 1000 mm conveyor belt by 110 meter of 6D 4th belt and shortening by 140 meter of the same belt in RIV seam of Khottadih Colliery.
2022_ECL_250780_1
GM-PND/EandM/22-23/29/1705 dated 19/07/2022
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Khottadih Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹7,300
10 Sept 2022
22 Jul 2022
3 Aug 2022
23 Jul 2022
2 Aug 2022
23 Jul 2022
23 Jul 2022 - 30 Jul 2022
Amount
Extension of 1000 mm conveyor belt by 110 meter of 6D 4th belt and shortening by 140 meter of the same belt in RIV seam of Khottadih Colliery. (Inclusive of CMPF/EPF)
Transportation of complete 110 mtr. structure with top & bottom roller from store to work site at R-IV seam, lying & fitting @ 68Kg/mtr.
1000 mm PVC belting transportation from store to workplace at R-IV seam, lying and trial run
Transportation and fitting of one hopper
Transportation and fitting of one Tail end
One Time hopper with tail-end of shifting= 14 HeadX 1.5 Shift=21 Head ( Semi-skilled 6 head @1351.56/-, Un-skilled 15 Head @ 1280.95/-, Total one time cost = Rs. 27323.00/- so, for 3 time hopper and tail end shifting
Shortening of 6Dip-4th belt by 140 mtr.(One Time hopper with tail-end of shifting= 14 HeadX 2.0 Shift=28 Head ( Semi-skilled 8 head @1351.56/-, Un-skilled 20 Head @ 1280.95/-, Total one time cost = Rs. 27323.00/-)
Holding drum bolts for extension and shortening 9 hole each time for 3 time shifting and 1 time shortening
Fabrication of hopper
Fabrication of tail-end assembly
consumable Nut-Bolt and washer
Total impact of GST for the purpose of CTC
SABIR CONSTRUCTION
BABLU SINHA
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .