Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Rejected-Technical 12 LANDT HOUSE SHIVAJI NAGAR NORTH AMBAZARI ROAD NAGPUR MAHARASHTRA 440010 | NAGPUR | NAGPUR | MAHARASHTRA | 440010 | Rejected-Technical Non compliance of Clause 9(b)(4) of the NIT |
| 2 | Rejected-Technical | Rejected-Technical As per clause 13(b) of the NIT |
| 3 | Rejected-Technical BHAGAT SINGH COLONY WARD NO 9 MORWA SINGRAULI DIST SINGRAULI M P 486889 | SINGRAULI | SINGRAULI | M P | 486889 | Rejected-Technical As per clause 13(b) of the NIT |
| 4 | Rejected-Technical NEAR RADHA KRISHNA MANDIR VIKASH BHAWAN JAYANT SINGRAULI MP PIN 486890 | JAYANT | SINGRAULI | MADHYA PRADESH | 486890 | Rejected-Technical As per clause 13(b) of the NIT |
Tender Value
Refer Docs
EMD Value
₹26,700
Closing Date
21 Oct 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff Officer (Excv), NCL Jhingurda Project
Staff Officer (Excv) Office, NCL Jhingurda Project, Pin code-486889
Replacement of under carriage Components , reconditioning of blade assly, co-axial line boring of blade, bogie and arm assly pin, bush housing, structure repairing denting work of Dozer D475A5 Sl.NO. T-3869 and repairing with co-axial boring of 01
2025_NCL_345358_1
JRD/SO(X)/E-TENDER/25-26/163 dated 10.10.2025
Open Tender
Excavation Department Work
Item Rate
28 days
NCL Jhingurda Project
Please refer Tender documents.
3 documents required · 3 mandatory
₹26,700
2 Nov 2025
10 Oct 2025
22 Oct 2025
10 Oct 2025
21 Oct 2025
11 Oct 2025
10 Oct 2025 - 17 Oct 2025
SCOPE OF WORK FOR A. Dismantling/Removal of Under Carriage components on both side 1. Washing and Cleaning of arm assly. 2. Dismantling of blade assly. 3. Dismantling of chain one side. 4. Removing of Bogie from track frame. 5. Removing of master link bolt. 6. Removing of worn out(old) carrier roller 7. Removing of track roller(old) from track frame. 8. Demounting of 05 nos. sprocket teeth assly from sprocket drum assly. B. Repairing/ Co-axial boring of Bogie, and track pad pin housing, Arm pin housing , tilt cylinder eye housing blade Centre pin housing ect of Dozer D-475 1. Dismantling of Arm from blade assly 2.Dismantling of tilt cylinder, lift cylinder and brace rod. 3. Repairing /re-welding of mounting eye of bogie and track pad 4. Under Cutting of the oval porion of the eye of bogie and track pad for making it suitable for re-welding. 5. Machining /Co-axial boring of eye of bogie and track pad. 6. Rewelding of arm pin housing 08 nos. different size. 7. Co-axial boring of arm pin housing -08 nos. 8. Welding of different size of blade pin housing 08 no. 9. Co-axial boring of blade pin housing . 10. Welding of centre pin housing of blade assly. 11. Co-axial boring of blade Centre pin housing. 12. Welding of tilt cylinder eye housing 02 nos. each side. 13. Boring of arm side tilt cylinder eye housing 02 nos.each side. 14. Welding of lift cylinder eye housing 02 nos. each side. 15. Boring/machining of blade side lift cyinder eye housing 02 nos each side. 16. Welding and machining of 11 nos pin 17. Welding/ Hard facing welding on blade assly. 18. Grinding Charges C. Fitment of Arm, blade assly D. Fitment of track frame, roller, chain and carrier roller etc on both side 1. Fitment of new Carrier roller. 2. Fitment of new track roller. 3. Fitment of new sprocket teeth 05 nos. 4. Assembling of sprocket teeth on sprocket drum 5. Fitting of track chain. 6. Fitment of master link bolt E. Repairing/ reconditioning of 01 no. blade assly of BEML BD-355 dozer(As float) 1. Cutting/gouging of damaged area & grinding of blade front & rear side. 2. Cutting of new plate & scrap plate from scrap. 3. Bending, tacking & welding of above job. 4. Repairing of blade arm both side. 5. Repairing of pin, pin hole & blade bracket both side by cutting, welding and grinding. 6. Rebuilding /repairing & grinding of both side trunnion & its cap as per required shape & size. 7. Hiring of welding machine alongwith welding ascessories, gas cutting devices, safety applainaces etc. F. 01 no. Co-axial boring/boring of pin housing assy./Sub assly of Blade arm and linkage of BEML BD-355 Dozers 1. Dismantling of arm from Blade 2. Dismantling of Cylinder and linkeage 3. Welding and machineing of pin 10no. 4. Welding of pin housing 26 nos. (different Size) 5. Co-axial boring of pin housing of Arm assly both side 6. Co-axial boring of cylinder pin housing 7. Co-axial boring of Brace rod pin housing on Blade side. 8.Co-axial boring of brace rod housing 02 nos. 9. Co-axial boring of arm cylinder pin housing in blade side. 10. Assembling of arm from Blade & Cylinder and linkeage 11. Hiring of 01 no Welding Mahcine for 16 days
Hiring of 01 no Welding Mahcine for scope of work E & F
Hiring of 02 no Welding Mahcine for scope of work A & B
Charges for Co-axial boring for Scope of Work B & F
Grinding charges for Scope of Work B, E & F
Machining Charges for Scope of Work B & F
Labour Charges for scope of work A, B, C, D, E, F (incl skilled welder, skilled fitter, unskilled & Supervisor)
Contractor Profit
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
finance_358020.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.23 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 3.01 MB
Annexure163.pdf
Tender Documents • 1.22 MB
ITBCOCATC.pdf
Tender Documents • 1.12 MB
BOQ_358020.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .