Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹18.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹19.3 L+₹1.1 L (6.04%)Admitted-Fee/PreQual/Technical/Finance 19B CHIDAMBARANATHAPURAM DEVAKOTTAI SIVAGANGAI DISTRICT | TIRUCHIRAPPALLI | TAMIL NADU | 621308 | ₹19.3 L+₹1.1 L (6.04%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹20.7 L+₹2.6 L (14.1%)Admitted-Fee/PreQual/Technical/Finance | ₹20.7 L+₹2.6 L (14.1%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹20.8 L+₹2.6 L (14.5%)Admitted-Fee/PreQual/Technical/Finance | ₹20.8 L+₹2.6 L (14.5%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹20.9 L+₹2.7 L (15.1%)Admitted-Fee/PreQual/Technical/Finance | ₹20.9 L+₹2.7 L (15.1%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Arulkumar L4 | ARS CONSTRUCTIONS L5 | N K MUGILEESHWAR L6 | Elango L7 | Kannan L2 | P Sampath L1 | R ARUNMOZHIDEVAN L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.01Reconstrution to Weir at Koolamban Eri Edapattu Panchayat Melmalaynaur Block | ||||||||||
| 1.02 | Earthwork excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil inclusive of shoring to full depth strutting and bailing out w | 197.28 | Cum | 240.8 ₹47,505.02 | 150 ₹29,592 Lowest | 229.15 ₹45,207.16 | 235.03 ₹46,366.32 | 220 ₹43,401.6 | 196.52 ₹38,768.7 | 224.24 ₹44,237.94 |
| 1.03 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 48.21 | Cum | 5,010 ₹2,41,532.1 | 4,700 ₹2,26,587 | 5,165.8 ₹2,49,043.4 | 5,298.26 ₹2,55,429.13 | 4,600 ₹2,21,766 | 4,430.08 ₹2,13,574.3 Lowest | 5,055.05 ₹2,43,704.04 |
| 1.04 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 203.22 | Cum | 6,180 ₹12,55,899.6 | 6,410 ₹13,02,640.2 | 6,297.73 ₹12,79,823.94 | 6,459.21 ₹13,12,639.94 | 5,740 ₹11,66,482.8 | 5,400.8 ₹10,97,549.67 Lowest | 6,162.71 ₹12,52,385.2 |
| 1.05 | For Centering without strutting(up to basement) | 217.2 | Cum | 462.5 ₹1,00,455 | 500 ₹1,08,600 | 475.63 ₹1,03,306.17 | 487.82 ₹1,05,955.05 | 432 ₹93,830.4 | 407.89 ₹88,593.17 Lowest | 465.43 ₹1,01,091.34 |
| 1.06 | for centering With Strutting | 122 | Sqm | 931.7 ₹1,13,667.4 | 850 ₹1,03,700 | 951.25 ₹1,16,052.97 | 975.64 ₹1,19,028.69 | 865 ₹1,05,530 | 815.78 ₹99,524.55 Lowest | 930.86 ₹1,13,564.86 |
| 1.07 | Providing Citizen Information board charges | 1 | Nos | 4,500 ₹4,500 | 1,175.9 ₹1,175.9 Lowest | 3,040.54 ₹3,040.54 | 3,118.5 ₹3,118.5 | 2,500 ₹2,500 | 2,607.5 ₹2,607.5 | 2,975.35 ₹2,975.35 |
| 1.08 | Photographic charges | 1 | Nos | 500 ₹500 | 1,000 ₹1,000 | 434.36 ₹434.36 | 445.5 ₹445.5 | 500 ₹500 | 372.5 ₹372.5 Lowest | 425.05 ₹425.05 |
| 1.09 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 3,16,631 ₹3,16,631 | 3,18,801 ₹3,18,801 | 3,22,818 ₹3,22,818 | 3,31,095 ₹3,31,095 | 2,93,582 ₹2,93,582 | 2,76,842 ₹2,76,842 Lowest | 3,15,897 ₹3,15,897 |
Tender Value
Refer Docs
EMD Value
₹24,610
Closing Date
21 Sept 2026, 3:00 pmClosed
BDO BP
Melmalayanur
Reconstruction of Weir at Kolambana Eri in Edapattu Panchayat
2026_RDTN_704850_1
MITank 2026
Open Tender
Civil Works
Works
90 days
Melmalayanur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹24,610
Yes
21 Sept 2026
16 Sept 2026
21 Sept 2026
16 Sept 2026
21 Sept 2026
16 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Reconstrution to Weir at Koolamban Eri Edapattu Panchayat Melmalaynaur Block | - | - | - | - |
| 1.02 | Earthwork excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil inclusive of shoring to full depth strutting and bailing out w | 197.28 | Cum | 263.78 | ₹52,038.52 |
| 1.03 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 48.21 | Cum | 5,946.42 | ₹2,86,676.91 |
| 1.04 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 203.22 | Cum | 7,249.39 | ₹14,73,221.04 |
| 1.05 | For Centering without strutting(up to basement) | 217.2 | Cum | 547.5 | ₹1,18,917 |
| 1.06 | for centering With Strutting | 122 | Sqm | 1,095 | ₹1,33,590 |
| 1.07 | Providing Citizen Information board charges | 1 | Nos | 3,500 | ₹3,500 |
| 1.08 | Photographic charges | 1 | Nos | 500 | ₹500 |
| 1.09 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_847271.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .