Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60.6 LAccepted-AOC | ₹60.6 L Quoted ₹51.4 L | L1 | Accepted-AOC after negotiation L1 bidder accepted by TAC |
| 2 | L2₹55.6 LRejected-AOC NO 17 NEW CAUVERY NAGAR THANJAVUR 613 001 | THANJAVUR | TAMIL NADU | 613001 | ₹55.6 L | L2 | Rejected-AOC after negotiation L1 bidder L2 bidder will be rejected |
| 3 | Rejected-Technical | - | - | Rejected-Technical Pre-Qualification criteria as per check slip not fulfilled |
| 4 | Rejected-Technical DOOR NO 90 C1 AYYAMPERUMAL ST VIRUDHUNAGAR TOWN | - | - | Rejected-Technical Pre-Qualification criteria as per check slip not fulfilled |
| Sl No | Description | Qty | Unit | ENDEAVOUR UTILITY SYSTEMS L1 | SRI JAGATHI CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. Data worked out for 48 m3 per day/8 hrs. | 101 | Cum | 237 ₹23,937 Lowest | 240 ₹24,240 |
| 2.00 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as direct- ed by the departmental officers. | 37 | Cum | 111 ₹4,107 Lowest | 115 ₹4,255 |
| 3.00 | Supplying and filling in foundation, basement, etc with filling Crushed Stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 30.5 | Cum | 2,094 ₹63,867 Lowest | 2,100 ₹64,050 |
| 4.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 87 | Cum | 418 ₹36,366 Lowest | 430 ₹37,410 |
| 5.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers - Mixing by mechanical means | 30.5 | Cum | 6,374 ₹1,94,407 Lowest | 6,400 ₹1,95,200 |
| 5.01 | Foundation and Basement | 27.6 | Cum | 9,988 ₹2,75,668.8 Lowest | 10,500 ₹2,89,800 |
| 5.02 | For Ground Floor | 2.6 | Cum | 10,127 ₹26,330.2 Lowest | 10,550 ₹27,430 |
| 6.00 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.- Mixing by mechanical means | 20.5 | Cum | 7,960 ₹1,63,180 Lowest | 8,100 ₹1,66,050 |
| 7.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | 30.5 | Qtl | 9,297 ₹2,83,558.5 Lowest | 9,350 ₹2,85,175 |
| 8.00 | Add additional labour for works above plinth/Basement level in every upper floor over the preceding floor or Below Ground level of every 3.50m depth. | 3 | Qtl | 9,494 ₹28,482 Lowest | 9,600 ₹28,800 |
Tender Value
₹51.4 L
EMD Value
₹61,000
Closing Date
26 Feb 2026, 5:45 pmClosed
Executive Engineer
Tamil Nadu State Agricultural Marketing Board, CIPET Road, Thiru.Vi.Ka industrial estate, Guindy, Chennai-32
Establishment of 100 MT Cold Storage for Kamuthi Regulated Market in Ramanathapuram District
2026_TAMBC_665864_1
TNSAMB-2025-55
Open Tender
Civil Works
Lump-sum
150 days
Kamuthi Regulated Market in Ramanathapuram Distric
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹61,000
7 May 2026
26 Feb 2026
27 Feb 2026
26 Feb 2026
26 Feb 2026
26 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. Data worked out for 48 m3 per day/8 hrs. | 101 | Cum | 237.65 | ₹24,002.65 |
| 2 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as direct- ed by the departmental officers. | 37 | Cum | 111.09 | ₹4,110.33 |
| 3 | Supplying and filling in foundation, basement, etc with filling Crushed Stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 30.5 | Cum | 2,094.4 | ₹63,879.2 |
| 4 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 87 | Cum | 418.7 | ₹36,426.9 |
| 5 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers - Mixing by mechanical means | 30.5 | Cum | 6,374.62 | ₹1,94,425.91 |
| 5.01 | Foundation and Basement | 27.6 | Cum | 9,988.83 | ₹2,75,691.71 |
| 5.02 | For Ground Floor | 2.6 | Cum | 10,127.6 | ₹26,331.76 |
| 6 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.- Mixing by mechanical means | 20.5 | Cum | 7,960.52 | ₹1,63,190.66 |
| 7 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | 30.5 | Qtl | 9,297.18 | ₹2,83,563.99 |
| 8 | Add additional labour for works above plinth/Basement level in every upper floor over the preceding floor or Below Ground level of every 3.50m depth. | 3 | Qtl | 9,494.38 | ₹28,483.14 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
Tendernotice_2.pdf
PDF • 2.71 MB
BOQ_799786.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].