Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAdmitted-Finance | ₹6.2 L | L1 | Admitted-Finance |
| 2 | L2₹6.2 L+₹5,428 (0.88%)Admitted-Finance | ₹6.2 L+₹5,428 (0.88%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M M Engineers L2 | M/s AADRIKA ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.01 | Disconnecting of HT supply from main panel after switching off 11 KV VCB discharging the supply. Complete dismantling of all protection relays, cable end boxes, vent pipes and other items as required. | 1 | Job | 25,500 ₹30,090 | 24,500 ₹28,910 Lowest |
| 1.02 | Cleaning of transformer the help of air blowers, dry clothes and other tools & tackles as required during the execution. Cleaning of HV and LV Bushing, complete cleaning of core capsule, the works includes the tightness of the internal active parts of core-coil assembly. | 1 | Job | 26,500 ₹31,270 | 25,500 ₹30,090 Lowest |
| 1.03 | Replacement of WTI (TR 7570) of the transformer along with Protection sensors complete as per site requirement. The work includes calibration of the same at site. Make - PECON | 1 | Set | 1,15,000 ₹1,35,700 Lowest | 1,15,000 ₹1,35,700 Lowest |
| 1.04 | Replacement of Transformer surge arrestors complete in all respect. | 1 | Set | 1,05,500 ₹1,24,490 Lowest | 1,05,500 ₹1,24,490 Lowest |
| 1.05 | Replacement of all doors gasket of the transformer for complete protection. | 1 | Set | 1,04,000 ₹1,22,720 Lowest | 1,04,000 ₹1,22,720 Lowest |
| 1.06 | Checking & matching of control wiring of all protection relays and calibration of protection relays including testing the same. | 1 | Job | 45,000 ₹53,100 | 44,500 ₹52,510 Lowest |
| 1.07 | Complete Testing of the transformer for possible site tests such as:- 1. Magnetic Balance Test. 2. IR Value Checks before and after the work. 3. Voltage ratio Test at 440V. 4. DC logic test. 5. Single Phase Open circuit | 1 | Job | 56,500 ₹66,670 | 55,400 ₹65,372 Lowest |
| 1.08 | Complete Energizing of transformer by connecting of HT supply from the main 11 KV VCB Panel. | 1 | Job | 25,500 ₹30,090 | 25,000 ₹29,500 Lowest |
| 1.09 | Complete cleaning and chemically washing of muddy transformer body and painting of transformer with enamel paint. | 1 | Job | 26,000 ₹30,680 | 25,500 ₹30,090 Lowest |
Tender Value
Refer Docs
EMD Value
₹12,400
Closing Date
22 Jun 2026, 3:00 pmClosed
Office of the Ex. Eng. (E and M) M-2
Pocket-A, Dilshad Garden, Delhi-110095
Repairing/ Overhauling of Voltamp Make Transformer No.-2 of capacity 630 KVA installed at Shalimar Park BPS.
2026_DJB_293544_1
NIT No. 06 (26-27)
Open Tender
Miscellaneous Works
Works
45 days
Shalimar Park BPS.
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Ac No. 50448339804
₹12,400
2 Jul 2026
16 Jun 2026
22 Jun 2026
16 Jun 2026
22 Jun 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1.01 | Disconnecting of HT supply from main panel after switching off 11 KV VCB discharging the supply. Complete dismantling of all protection relays, cable end boxes, vent pipes and other items as required. | 1 | Job | 80 | ₹80 | 18% |
| 1.02 | Cleaning of transformer the help of air blowers, dry clothes and other tools & tackles as required during the execution. Cleaning of HV and LV Bushing, complete cleaning of core capsule, the works includes the tightness of the internal active parts of core-coil assembly. | 1 | Job | 80 | ₹80 | 18% |
| 1.03 | Replacement of WTI (TR 7570) of the transformer along with Protection sensors complete as per site requirement. The work includes calibration of the same at site. Make - PECON | 1 | Set | 80 | ₹80 | 18% |
| 1.04 | Replacement of Transformer surge arrestors complete in all respect. | 1 | Set | 80 | ₹80 | 18% |
| 1.05 | Replacement of all doors gasket of the transformer for complete protection. | 1 | Set | 80 | ₹80 | 18% |
| 1.06 | Checking & matching of control wiring of all protection relays and calibration of protection relays including testing the same. | 1 | Job | 80 | ₹80 | 18% |
| 1.07 | Complete Testing of the transformer for possible site tests such as:- 1. Magnetic Balance Test. 2. IR Value Checks before and after the work. 3. Voltage ratio Test at 440V. 4. DC logic test. 5. Single Phase Open circuit | 1 | Job | 80 | ₹80 | 18% |
| 1.08 | Complete Energizing of transformer by connecting of HT supply from the main 11 KV VCB Panel. | 1 | Job | 80 | ₹80 | 18% |
| 1.09 | Complete cleaning and chemically washing of muddy transformer body and painting of transformer with enamel paint. | 1 | Job | 80 | ₹80 | 18% |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
NIT.pdf
Tender Documents • 0.92 MB
BOQ_390149.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .