Tender Value
₹40.3 L
EMD Value
₹40,300
Closing Date
21 Oct 2026, 2:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE/GCC/SALEM
Superintending Engineer , TANTRANSCO, General Construction Circle, Salem - 636 014.
Providing structure plinth, cable duct, metal spreading and allied civil works for erection of 1 No. 110 KV HV breaker and allied equipments and electrical works at Uppupalayam 110/22 KV SS in Mettur EDC.
2026_EB_711574_1
T.S.No.12/2026-27 of SE/GCC/Salem (GL)
Open Tender
Civil Works
Item Rate
120 days
UPPUPALAYAM
AS PER BQR CONDITION
2 documents required · 2 mandatory
₹0
₹40,300
Yes
7 Oct 2026
7 Oct 2026
22 Oct 2026
7 Oct 2026
21 Oct 2026
7 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling Of PCC using deploying machine and transporting debris etc away from the site to a lead of 100m including cost of all lead, lift, conveyance , loading, unloading etc. complete | 7 | m3 | - | - |
| 2 | Earthwork excavation for foundation with an initial lead of 10 m and lift of 2 m etc complete for in hard gravelly soil | 46 | m3 | - | - |
| 3 | Earthwork excavation for foundation with an initial lead of 10 m and lift of 2 m etc complete for In SDR (Not Requiring Blasting) | 16 | m3 | - | - |
| 4 | Earthwork excavation for foundation with an initial lead of 10 m and lift of 2 m etc complete for In MR and DMR not requiring blasting | 12 | m3 | - | - |
| 5 | Removal of hard rock by wedging and chiselling and trimming to proper shape | 4 | m3 | - | - |
| 6 | PCC 1:3:6 using 20 mm HBG metal for foundation including cost of cement without formwork all materials, labour, lead, lift etc. complete. | 6 | m3 | - | - |
| 7 | PCC 1:2:4 mix using 20 mm down graded HBG machine crushed metal for plinth foundation concrete, cost of all labour, materials, lead, lift, curing etc. complete as per standard specification. Without Form Work | 44 | m3 | - | - |
| 8 | PCC 1:2:4 mix using 20mm down graded HBG machine crushed metal for plinth foundation concrete, cost of all labour, materials, lead, lift, curing etc. complete as per standard specification. With Work | 4 | m3 | - | - |
| 9 | RCC 1:1.5:3 using 12 to 20mm machine crushed metal for precast cable duct slab with formwork including cost of all materials, labour lead, litf, curing, etc., complete. Excluding the cost of steel reinforcement ( For Pre cast cable duct slab ) | 1.5 | m3 | - | - |
| 10 | Providing steel reinforcement using steel of grade Fe 500 for RCC works including cost of steel, binding wire and placing in postion of the steel reinforcement, including cost of all materials, lead, lift, etc., complete. | 0.13 | MT | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
BOQ_854886.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .