Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
21 Jul 2023, 3:00 pmClosed
commissioner madurai corporation
Aringar Anna Maligai
Relaying BT Road Road at Pillayar kovil Street (115015R4586), Muniyandi Koil street (115015R4587), Muniyandi koil west 1st Cross Street (115015R4588), PTR Nagar Main Road (115015R4606), PTR Nagar 1ST Cross street (115015R4607), PTR Nagar2nd Cross S
2023_MAWS_338326_1
E6/Package 9 NSMT/23-24
Open Tender
Civil Works
Lump-sum
60 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.7 L
11 Oct 2023
7 Jul 2023
21 Jul 2023
7 Jul 2023
21 Jul 2023
7 Jul 2023
Amount
BT Road Charges for Cutting the BT Surface to 5 to 7 cm depth using Milling machine conveying the milled waste materials to atleast for 20 km distance including hire and running charges for the machine. Conveyance charges. Unloading at unobjectionable place. cleaning the milled surface as to avoid slippery including all other incidental and unforeseen items etc, complete as per the direction of the departmental officers
Advance Patchwork 13.20mm Providing Advancve Patchwork using 50mm consolidated Thickness by using 1m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1m3 of Metal For Pre Mixing For existing surface advance Patchwork including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for pre mix carpet only rolling by 60-70KN power roller for pre mix carpet and seal coat seperately including labour charges for spreading the mix for pre mix carpet application of bitumen for seal coat over pre mix carpet, including labour charges for spreading seal coat seperately over premix carpet etc.including higher charges and fuel charges for, bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications
Providing and laying tack coat of 2 kgs/10 sqm over B.T surface treated with binder using 2 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications.
Providing and laying Bituminous Concrete to 30/ 40 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 /VG40 bitumen for premixing per 10sqm including cost and conveyance of all material to CMP site. heating the bitumen and aggregate to the required temperature and mixing the minimum required Temperature in central hot mix plant 20-30 tonnes capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonns Vibratory/ Pneumatic Roller to their required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 ton CMP with bitumen boiler , tipper trucks, paver finisher / 9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev specification using.
CC Road Dismantling the existing for cement concrete road surface the debris clearing away from the site etc.complete..,
Plain Cement Concrete 1:1.5:3 (one cement,one and half fine aggregate sand three coarse aggregates) using 40mm size ISSHBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Providing and fixing Bitumen Pad for Exoansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification
Charges towards finishing the concrete surface with power traveler machine rate shall include the cost of fule charges hire for machine and labour charges for operation etc.,,
Add GST 18%
SPS CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .