| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.8 LAccepted-Finance 50 A BILAYET ALI ROAD TALPUKUR BARRACKPORE KOLKATA 700123 | BARRACKPORE | 24 PARAGANAS NORTH | WEST BENGAL | 700123 | ₹62.8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹62.8 L+₹628.47 (0.01%)Rejected-Finance BEHALA GOVT QTR BLOC K III CAL 60 700060 | KOLKATA | WEST BENGAL | 700060 | ₹62.8 L+₹628.47 (0.01%) | L2 | Rejected-Finance L2 |
| 3 | L3₹70.4 L+₹7.6 L (12.0%)Rejected-Finance | ₹70.4 L+₹7.6 L (12.0%) | L3 | Rejected-Finance L3 |
Tender Value
₹62.8 L
EMD Value
₹1.3 L
Closing Date
30 Mar 2026, 12:00 pmClosed
DIRECTOR GENERAL (ROADS)
CHAPLIN BHAVAN, 2ND FLOOR, 5/1, CHOWRINGHEE PLACE, KOLKATA-700013
REPAIRING OF ROAD SURFACE AT DR. LAL MOHAN BHATTACHARYA ROAD FROM MOULALI CROSSING TO PHILLIPS MORE UNDER BR-VI.
2026_KMC_1013733_1
KMC/ROADS/2025-2026/768
Open Tender
CIVIL WORKS
Percentage
120 days
KOLKATA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.3 L
3 Sept 2026
7 Mar 2026
2 Apr 2026
7 Mar 2026
30 Mar 2026
7 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF MACHINERIES 8.29Hire charges for engaging Air Compressor machine with minimum pressure capacity of 5.0 Kg/sq.cm arrangement including all necessary equipments and operating staff, carriage, fuel, Tools and plants all complete for cutting Road / hard crust cutting with pneumatic hammer at desired point in water supply works as per direction of EIC . a) With Pneumatic hammers For minimum engagement of 8 hrs. In a day | 14 | DAY | 6,000 | ₹84,000 |
| 2 | Wet Mix Macadam Base Course Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including screening of aggregates and granular materials, premixing the material with water at OMC in Wet Mix Plant, carriage of mixed material by tipper to site, laying in uniform layers with Paver in Sub- base / Base course on well prepared surface and compacting with Vibratory Roller to achieve the desired density, including supply of all materials, machinery, fuel and lubricants, including incidental costs for lighting. guarding, barricading, making earthen bundh to protect the edges including cost of quality control complete as per Clause 406 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).(Rate as per PWD(WB) schedule of rates 2018(Roads & Bridge Work) , page-249(item-4.12) & 212(table3.3-1) and 4th Addenda & Corrigenda) | 87.79 | M3 | 2,421.44 | ₹2,12,567.44 |
| 3 | DENSE BITUMINOUS MACADAM [Using Bitumen VG-40 (30/40)] Providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregate of specified grading, filler(Cement /hydrated lime / Rock dust) premixed with bituminous binder of approved grade @4.0% (min) for Grading -1 and 4.5% (min) for Grading -2 by weight of total mix as per table 500-10 and mix design done as per table 500-11 and job mix formula as per clause 505.3.3 of MoRT&H (5th Revision), including screening, cleaning of chips, transporting the hot mix to work site, laying the mixed materials at specified laying temperature, as specified in Table 500-2 with a hydrostatic paver finisher with sensor control to the required grade, level and alignment over prepared surface coated with tack coat, rolling with smooth wheeled and vibratory or tandem rollers or with a pneumatic tyre roller of 12 to 15 tonne weight with a tyre pressure of at least 0.56 Mpa, to achieve the desired density as per clause 505.3.5, all including cost and carriage of bitumen, crushed aggregates, filler materials and hire charges of machinery and equipment for construction and quality control complete as per Clause 505 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). B. For Grading 2 (26.5 mm nominal size, 50-75 mm thick.) (i) Using Batch Type HMP of minimum capacity 100-120 TPH. (Rate as per PWD(WB) schedule of rates 2018(Roads & Bridge Work),page-213(table-3.3-1) & 253(item 5.05)./ 8th Addenda & Corrigenda , SOR:2018,7th Addenda & Corrigenda SOR 2018) | 292.62 | M3 | 7,500.3 | ₹21,94,726.54 |
| 4 | Taking out stone slab of kerb & channel of road side drain and stacking as directed.
b) flat channel stone. ( Ref :Rate based on PWD Current SOR. [PWD(B)2017,p-303]) | 655 | MTR | 8.17 | ₹5,351.35 |
| 5 | Taking out stone slab of kerb & channel of road side drain and stacking as directed.
a) vertical kerb stone. ( Ref :Rate based on PWD Current SOR. [PWD(B)2017,p-303]) | 535 | MTR | 8.17 | ₹4,370.95 |
| 6 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2).
b) flat channel stone. ( Ref :Rate based on PWD Current SOR. [PWD(B) 2017, p-303 & 3rd corri. Addea dtd-04.06.2018. P-52 ]) | 524 | MTR | 18.3 | ₹9,589.2 |
| 7 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2).
a) Vertical Kerb ( Ref :Rate based on PWD Current SOR. [PWD(B) 2017, p-303 & 3rd corri. Addea dtd-04.06.2018. P-52 ]) | 428 | MTR | 21.43 | ₹9,172.04 |
| 8 | Supplying and laying factory made flat channel stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated; size 500mm X 300mm X 100 mm; making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder) ( Ref :Rate based on PWD Current SOR [PWD(B) 2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6) and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it -18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226, ) | 131 | EA | 214.63 | ₹28,116.53 |
| 9 | Supplying and laying factory made vertical kerb stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated size 500mm X 350mm X 150mm tapered at top, making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder / footpath) ( Ref :Rate based on PWD Current SOR [PWD(B) 2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6) and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it -18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226, ) | 107 | EA | 298.22 | ₹31,909.54 |
| 10 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation.
(a) 1:3:6 proportion ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.23 & 3rd Corrigenda Addenda dtd-04.06.18, P-9 & 10) | 20.76 | M3 | 4,761 | ₹98,820.51 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_2490019.xls
BOQ • 0.31 MB
form1.pdf
Tender Documents • 0.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .