| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC SE MOTTUR VILLAGE SERPAPATTU POST THANDARAMPET TALUK TIRUVANNAMALAI DISTRICT 606753 | TIRUVANNAMALAI | TAMIL NADU | 606753 | ₹1.0 Cr | L1 | Accepted-AOC LER |
| 2 | L2₹1.0 Cr+₹6,396.60 (0.06%)Rejected-Finance | ₹1.0 Cr+₹6,396.60 (0.06%) | L2 | Rejected-Finance AER |
Tender Value
₹1.0 Cr
EMD Value
₹1.0 L
Closing Date
24 Jul 2024, 3:00 pmClosed
The Additional Collector (Dev.), DRDA
DRDA, Tiruvannamalai
Strengthening of Rural Roads 3 Nos. in Thandarampattu Block of Tiruvannamalai District Package No.TVM/2024-25/35 under Mudhalvarin Grama Salaigal Membattu Thittam 2024-25
2024_RDTN_458881_1
No.1685/2024/A11 Date. 24.06.2024 35
Open Tender
Civil Works - Roads
Item Wise
180 days
Thandarampattu
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.0 L
2 Sept 2024
1 Jul 2024
24 Jul 2024
1 Jul 2024
24 Jul 2024
1 Jul 2024
Amount
Road - I : Strengthening of Varagur to Parayampattu road Km 0/0 - 1/360 R346
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking old metalled/BT surface upto 10cm thick as directed by the 3 departmental officers
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring. strutting, providing coffer dams, bailing out of water and other item 4 which may be necessary or convenient to the succesful completion of the excavation in a compacted condition a quality of materials not exceeding the amount of excavation including all machinery charges for T&P employed etc., complete for cutting side drains and forming berms as per standard specifications.
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying tack coat over Un Primed WMB/WMM surface at 7Kg of SS-1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Applying tack coat over Un Primed WMB/WMM surface at 2.5Kg of RS1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying fie required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., completa as per clause 503 of MOST specification.
BC 25mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.3kgs of VG30/VG40 bitumen including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH part-5
Provision for CD Works 1.50m RCC Slab culvert @ Ch:0/540
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of side
Cement concrete 1.4.8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing. laying and curing etc complete.
Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc, complete
Below Sill Level
Above Sill Level
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1.2 4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Reinforced cement concrete 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Providing and Fixing Tar paper for bearing bin bed black & deck slab For culvert
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Provision for Hectametre Stones
Provision for Kilometer Stones
Provision for Citizen Information board cum Name Board
Road - II : Strengthening of Porasampattu road at Perunduraipattu road Km 0/0 - 1/290 R188
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking old metalled/BT surface upto 10cm thick as directed by the 3 departmental officers
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring. strutting, providing coffer dams, bailing out of water and other item 4 which may be necessary or convenient to the succesful completion of the excavation in a compacted condition a quality of materials not exceeding the amount of excavation including all machinery charges for T&P employed etc., complete for cutting side drains and forming berms as per standard specifications.
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying tack coat over Un Primed WMB/WMM surface at 7Kg of SS-1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Applying tack coat over Un Primed WMB/WMM surface at 2.5Kg of RS1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying fie required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., completa as per clause 503 of MOST specification.
BC 25mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.3kgs of VG30/VG40 bitumen including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH part-5
Provision for Hectametre Stones
Provision for Kilometer Stones
Provision for Citizen Information board cum Name Board
Road - III : Strengthening of Vazhavachanur chetti street road to Peruduraipattu ADC road Km 0/0 - 1/280 R434
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking old metalled/BT surface upto 10cm thick as directed by the 3 departmental officers
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring. strutting, providing coffer dams, bailing out of water and other item 4 which may be necessary or convenient to the succesful completion of the excavation in a compacted condition a quality of materials not exceeding the amount of excavation including all machinery charges for T&P employed etc., complete for cutting side drains and forming berms as per standard specifications.
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying tack coat over Un Primed WMB/WMM surface at 7Kg of SS-1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Applying tack coat over Un Primed WMB/WMM surface at 2.5Kg of RS1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying fie required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., completa as per clause 503 of MOST specification.
BC 25mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.3kgs of VG30/VG40 bitumen including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH part-5
Provision for Hectametre Stones
Provision for Kilometer Stones
Provision for Citizen Information board cum Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Surya Constructions (BID ID -1089149)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .