Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.2 LAccepted-AOC | 1 | Accepted-AOC Lowest Amount Quoted BY BHARATHI | |
| 2 | 2₹4.3 L+₹12,458.50 (2.98%)Rejected-Finance | 2 | Rejected-Finance Admitted |
| Sl No | Description | Qty | Unit | BHARATHI L1 | KUMAR WORK CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all types of soil lead And lift ss 20 B etc complete Including All Labour Charges Including Cost and Conveyance etc Complete. .(1.00mx0.60mx1.05m) | 557.55 | cum | 330 ₹1,83,991.5 Lowest | 340 ₹1,89,567 |
| 2.00 | Supply and Following of 90mm dia PVC Pipe Including Cost and Conveyance etc Complete. 6 KSC | 885 | Rm | 142 ₹1,25,670 Lowest | 146 ₹1,29,210 |
| 3.00 | Supply and Fixing of PVC Pipe Including Cost and Conveyance etc Complete. | 885 | Rm | 22 ₹19,470 Lowest | 23 ₹20,355 |
| 4.00 | Refilling excavated earth Including All Labour Charges Including Cost and Conveyance etc Complete. . | 557.55 | cum | 46 ₹25,647.3 Lowest | 47 ₹26,204.85 |
| 5.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount | 63,860.18 ₹63,860.18 Lowest | 65,760.63 ₹65,760.63 |
Tender Value
₹4.2 L
EMD Value
₹4,240
Closing Date
3 Feb 2026, 3:00 pmClosed
Block Development Officer VP Acharapakkam
Block Development Office VP Acharapakkam
Construction of Openwell with Extension of Pipe Line to Kaliyakunnam village at Siruperpondi Panchayat in Acharapakkam Panchayat Union in Acharapakkam Panchayat Union in Chengalpattu District
2026_RDTN_648077_1
DIPR/4028/2025 A4
Open Tender
Civil Works
Item Rate
90 days
siruperpondi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,240
Yes
Block Development Office VP Acharapakkam
7 Mar 2026
28 Jan 2026
3 Feb 2026
28 Jan 2026
3 Feb 2026
28 Jan 2026
28 Jan 2026
Earth work excavation in all types of soil lead And lift ss 20 B etc complete Including All Labour Charges Including Cost and Conveyance etc Complete. .(1.00mx0.60mx1.05m)
Supply and Following of 90mm dia PVC Pipe Including Cost and Conveyance etc Complete. 6 KSC
Supply and Fixing of PVC Pipe Including Cost and Conveyance etc Complete.
Refilling excavated earth Including All Labour Charges Including Cost and Conveyance etc Complete. .
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_776961.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
Technical.pdf
Tender Documents • 1.22 MB
BOQ_776961.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .