Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2.5 L
EMD Value
₹4,920
Closing Date
4 Feb 2020, 6:00 pmClosed
Rajesh Bhagat
xen pwd div no ii jammu
Re-construction of the damaged drain and cross drainage at Sarwal Chowk, Jammu
2020_PWDJK_91624_1
138 of 2019-20
Open Tender
Civil Works
Item Rate
30 days
Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Yes
Treasury Challan under MH 0059 PW indicating name
₹4,920
Yes
10 Feb 2020
30 Jan 2020
5 Feb 2020
30 Jan 2020
4 Feb 2020
30 Jan 2020
Amount
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meres lead.
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 meteres lead. 1:3:6 or richer mix
Earthwork excavation by manual means in trenches for foundations, drains, pipes, cable etc. (not exceeding 1.5mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 Sqm on plan, depth upto 1.5 Mtr including disposal of excavated earth upto 1 mtr from cutting Edge, disposed earth is to be levelled and neatly dressed in all kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) (crushed)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level 1:3:6 grade (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) (Crushed)
Centring and shuttering including Strutting propping etc. and removal of form for:-
Foundations, footings bases of columns etc. for mass concrete.
Suspended floors, roofs, landings, balconies and access plateform.
Edges of slabs and breaks in floors and walls under 20 cms size
Reinforcement for RCC work including straightening cutting, bending , placing in position and binding all complete Thermo-Mechanically Treated bars.
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering , finishing and Reinforcement- All work upto plinth level 1:1.5:3 (1 Cement : 1.5 course sand : 3 graded stone aggregate 20 mm nominal size)
Steel work welded in built up sections/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladders, railings, brackets, gates & similar works.
Disposal of mulba by MT. including loading / unloading and carriage complete from designated sites and its disposal as per directions of Engineer in-charge, all inclusive (Av. Lead 10kms) out side the Municipal limits
Providing and laying cemnt concrete flooring 50 nm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand 4 graded stone aggregate 20mm nominal size (crushed) with cement slury
Labour engaged for excavation of the mulba deparited in the drains including diverting of the traffic for smooth vehicular movement & execution of work.
Carriage of material by MT including loading /Unloading and stacking at site completed.
Stone aggregate below 40mm size av. 10 kms
Sand for an average lead of 10 kms.
RAJINDER SINGH
VIKRAM SINGH
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .