Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹11.4 L+₹1,002.26 (0.09%)Rejected-Finance | L2 | Rejected-Finance Highest value quoted compared with estimate rate |
Tender Value
₹12.6 L
EMD Value
₹12,550
Closing Date
16 Nov 2023, 3:00 pmClosed
THe Block Development Officer(BP), Madukkarai
THe Block Development Officer(BP), Madukkarai
Construction of 100000 litres capacity of UG Sump in Balaji nagar at Seerapalayam Panchayat
2023_RDTN_388194_1
1025/2023/A3
Open Tender
Civil Works
Item Rate
180 days
Madukkarai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹12,550
Yes
1 Dec 2023
10 Nov 2023
16 Nov 2023
10 Nov 2023
16 Nov 2023
10 Nov 2023
Amount
Construction of 100000 litre capacity U.G.Sump in Balaji Nagar @ Seerapalayam H/O Seerapalayam..
Earth Work excavation in hard stiff clay black cotton hard red eart sahles murram ordinary gravel stoney eart mixed with 50% fair sized boulders etc with an initial of 10m nad lift of 2m and as directed by officers For Foundation ,First upto Depth 0 to 2m
Earth Work excavation in hard stiff clay black cotton hard red eart sahles murram ordinary gravel stoney eart mixed with 50% fair sized boulders etc with an initial of 10m nad lift of 2m and as directed by officers For Foundation,For HSC Hard Soil ,For SDR For Foundation
Filling with clean M sand Complying with standard Specificatin Including wateringramming and consolidation etc., coplete and as directed by officers
Levelling coarse in cement concrete 1:4:8 Using 40mm hard broken stone for foundation and alevelling coarse including Cost of all materials,mixing,placing,ramming,curing,finishing etc.,complete and as directed by officers. PCC Laying PCC Laying (Beyond 1.5m from GL)
Reinforced Cement Concrete 1:1.5:3 Using Machine Crushed 20mm ISS HBG Stone for the following members excluding,centering,shuttering and strutting Charges but Including the cost of all material mixing,placing ,iiffting ,viberating,finishing & curing etc., complete and as directed by officers Beyond 1.50m & Upto 4.50m below GL
Reinforced Cement Concrete 1:1.5:3 Using Machine Crushed 20mm ISS HBG Stone for the following members excluding,centering,shuttering and strutting Charges but Including the cost of all material mixing,placing ,iiffting ,viberating,finishing & curing etc., complete and as directed by officers upto 1.50m Below GL
Reinforced Cement Concrete 1:1.5:3 Using Machine Crushed 20mm ISS HBG Stone for the following members excluding,centering,shuttering and strutting Charges but Including the cost of all material mixing,placing ,iiffting ,viberating,finishing & curing etc., complete and as directed by officers upto 4.50m Above GL from GL
Supply and Erecting of Steel Centering,shuttering for Sofitfits and Sides including neessary Supports and strutting for all RCC works using MS sheets of suitable size of BG 10 complete and as directed by officers.
For 0.00 to 3.30m (Plane Surface)
For 0.00 to 3.30m (Cured Surface)
For 0.00 to 3.30m (Cured Surface)
For 3.30m to 4.30m (Plain Surface)
Supplyy and Fabricating and Placing In position of RTS Rods and Reinforeced Bars incliding materials and labour charges etc., For Rcc Works Directed by Officers
Upto 16mm Dia
Supply ,Delivery and fixing of CI manhole frame with cover of Following size Including coast of all materials,Fixing, and as directed by officers.
Colour Washing two coats Using Colour Pigments including cost of one coat of white washing,cost all materials ,and Labour Charges etc.,, complete and as Directed by officers.
Supply and fixing in position of RCC (1:1.5:3) in side access lader of using 20mm HBG Stone including cost of materials,centring ,shuttering ,reinforcement,placing of concrete,curing etc., complete directed by officers
Provisin of Suppiy & Fixing of MS ladder including Painting etc,.compled and Directed by officers
Painting Two Plastic Emulsion paint Includding all Materials and labouer cost etc., complete and directed By TWAD Officers
Earthwork excavation in all strata for laying Pipes including refiling Charges etc., complete directed by TWAD BD Officers
Refilling with Excavted earth Including Comsolidation etc Complete as Directed by TWDA BD Ofiicers
Cost and Supply of 75mm 6KSC Pipes etc.,
Laying and Jointing of PVC Pipes etc.,
Supply of Open /Sump Submerisal Pump Motor With ISI Mark Including cost Conveyance and all charges etc., Complete directed by officers
Cost and Supply of 5HP Panel Board
Provision for erection of Submersible motor
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
S.KARTHICK
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .