Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 CrAccepted-AOC | ₹10.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹11.0 CrRejected-Finance | ₹11.0 Cr | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical technically disqualified |
Tender Value
₹10.5 Cr
EMD Value
₹10.5 L
Closing Date
27 Jun 2024, 5:00 pmClosed
EE DWS Division Adityapur
o/o EE DWS Division Adityapur
Three years operation and Maintenance of Mango Uraban Water Supply Scheme under DWS Division Adityapur for the year 2023-24, 2024-25 and 2025-26.
2024_DWSD_86104_1
Mango/OM/02/2024-25 dt 05.06.2024
Open Tender
Civil Works - Water Works
1095 days
East Singhbhum
As specified in SBD
6 documents required · 6 mandatory
₹10,000
₹10.5 L
Yes
o/o EIC DWSD Jharkhand Ranchi.
28 Aug 2024
7 Jun 2024
28 Jun 2024
7 Jun 2024
27 Jun 2024
10 Jun 2024
10 Jun 2024
Amount
Three Years Operation and Maintenance of Mango water supply scheme consisting of main features such as WTP of capacity 48.0 MLD, back wash recovery system, Intake works at Swarnrekha River, Raw water rising mains 700mm dia D.I K-9-3.90 Kms. From Swarnrekha River to W.T.P, Clear Water Rising Mains D.I K-9 250mm to 500mm -20.65 kms& Distribution main 100mm to 800mm dia D.I K-7 pipe 246.844 km., 4 nos. of New ESR and 1 No. existing old ESR, and 6 Nos. different capacity of New UGR for the year 2023-24, 2024-25 & 2025-26 excluding Electricity Charges, But including LabourCess 1% & 18% GST. Three Years Operation and Maintenance of Mango water supply scheme consisting of main features such as WTP of capacity 48.0 MLD, back wash recovery system, Intake works at Swarnrekha River, Raw water rising mains 700mm dia D.I K-9-3.90 Kms. From Swarnrekha River to W.T.P, Clear Water Rising Mains D.I K-9 250mm to 500mm -20.65 kms& Distribution main 100mm to 800mm dia D.I K-7 pipe 246.844 km., 4 nos. of New ESR and 1 No. existing old ESR, and 6 Nos. different capacity of New UGR for the year 2023-24, 2024-25 & 2025-26 excluding Electricity Charges, But including LabourCess 1% & 18% GST
ABHAY KUMAR SINHA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid