| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹26.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹28.8 L+₹2.6 L (10.1%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹30.3 L+₹4.2 L (16.0%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹36.7 L+₹10.5 L (40.3%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹44.0 L
EMD Value
₹43,952
Closing Date
21 Sept 2026, 5:00 pmClosed
Managing Director, OSWC
O/o the Odisha State Warehousing Corporation, Cuttack Road, Bhubaneswar
Infrastructure development work at SWC Jagannathpur
2026_OSWC_140227_4
3650/OSWC/Civil/22/2026-27 dt.01.09.2026
Open Tender
Civil Works - Others
Percentage
120 days
Jagannathpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹43,952
Yes
23 Sept 2026
5 Sept 2026
22 Sept 2026
5 Sept 2026
21 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismanteling & removing RCC columns, beams, slab, staircase landing, lintels including stacking the useful materials for reuse and removing the debris away from the working area i.e. with in 50.00mtr. Lead., including cost of all labour and T&P required for the work etc. complete. | 2.42 | CUM | 1,731.8 | ₹4,190.96 |
| 2 | Cement concrete (1:2:4) using 12 mm size black hard granite chips of approved quality and from approved quarry including hoisting lowering laying and compacting with watering ,curring ,cost,conveyance, royalties and taxes of all materials ,cost of all labour and T&P required for the work etc, complete | 50.87 | CUM | 7,505.5 | ₹3,81,804.79 |
| 3 | Providing Angle (75mm*75mm*6mm) in shape of Y including fabrication with all cost,conv,tax,lab,etc,complete. | 1,992.67 | KG | 120 | ₹2,39,120.4 |
| 4 | Supplying fitting fixing of Barbed wire including cost,conv,tax,lab,etc,complete. | 346.5 | KG | 120 | ₹41,580 |
| 5 | Labour charges for fixing of barbed wire including cost,conv,tax,etc complete. | 2,310 | Rmtr | 0.99 | ₹2,286.9 |
| 6 | 12mm. Thick cememnt plaster (1:6) including cost,conv,tax,lab,etc,complete. | 19.35 | SQM | 193.14 | ₹3,737.26 |
| 7 | Wall Painting two coats with Weather coat paint of approved shade on new work including cost of paint. | 4,249.55 | SQM | 98.7 | ₹4,19,430.59 |
| 8 | Earth work excavation of foundation in hard soil with in initial lead and lift ….................etc. with all cost complete. | 129.14 | CUM | 210.5 | ₹27,183.97 |
| 9 | Filling F & P with excavated material including cost of all materials, labour….. Etc with all cost complete. | 18.09 | CUM | 117 | ₹2,116.53 |
| 10 | Filling in foundation & Plinth with sand well watered and rammed…......... Etc with all cost complete. | 49.57 | CUM | 596.65 | ₹29,572.96 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Tendernotice_2.pdf
PDF • 2.15 MB
BOQ_608244.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .