| 1 | L1₹4.9 CrAccepted-AOC | ₹4.9 Cr | L1 | Accepted-AOC Found lowest bidder |
| 2 | L2₹5.4 Cr+₹55.3 L (11.3%)Rejected-AOC | ₹5.4 Cr+₹55.3 L (11.3%) | L2 | Rejected-AOC Not found lowest bidder |
| 3 | L3₹5.5 Cr+₹57.4 L (11.8%)Rejected-AOC | ₹5.5 Cr+₹57.4 L (11.8%) | L3 | Rejected-AOC Not found lowest bidder |
| 4 | L4₹5.5 Cr+₹65.4 L (13.4%)Rejected-AOC | ₹5.5 Cr+₹65.4 L (13.4%) | L4 | Rejected-AOC Not found lowest bidder |
| 5 | L5₹5.7 Cr+₹79.9 L (16.4%)Rejected-AOC GYAMDU HOUSE OLD ROAD SHANAM LEH LADHAKH UT PIN 194101 | LEH LADAKH | LADAKH | 194101 | ₹5.7 Cr+₹79.9 L (16.4%) | L5 | Rejected-AOC Not found lowest bidder |
Tender Value
Refer Docs
Closing Date
8 Jan 2021, 11:00 amClosed
Chief Engineer P Himank
HQ CE P Himank Care of 56 APO
PROVING HMP READY MIX LAYNG BY PAVR ND COMPACN BC30MM INCD CORECTION WKS WTH BC30MM THK ND APPLYNG TACK COAT BERM FILING THERMOPLASTIC PAINT FOR CENTERLINE EDGE MARKNG FIXNG CAT EYE ND FIXNG DELINEATRS BET KM1PT884TO33PT30LU ND KM4PT345TO39PT883US RD
2020_BRO_604358_1
CE (P) Himank/06/2021-22
Open Tender
Civil Works - Roads
Item Rate
150 days
KM 1PT884 TO 33PT30 L U RD AND 4PT345 39PT883US RD
As per tender documents
14 documents required · 14 mandatory
₹0
Exempted
5 Mar 2021
19 Dec 2020
9 Jan 2021
19 Dec 2020
8 Jan 2021
29 Dec 2020
21 Dec 2020 - 28 Dec 2020
Amount
Providing and applying of tack coat by using bitumen VG-10 grade on existing surface after cleaning all complete as per clause 503 of MORT&H specifications (5th revision) for correction work between Km 1.884 to Km 3.945, Km 33.262 to Km 33.300 on Road Leh-Upshi and Km 4.345 to Km 4.450, Km 5.000 to Km 5.150, Km 5.700 TO Km 5.800, Km 6.670 to Km 6.720, Km 7.050 to Km 7.156, Km 7.460 to Km 7.726, Km 8.250 to Km 8.345, Km 8.550 to Km 8.630, Km 9.080 to Km 9.193, Km 9.880 to Km 9.910, Km 10.050 to Km 10.100, Km 21.320 to Km 21.350, Km 26.152 to Km 39.883 on Road Upshi-Sarchu.
Providing and Mixing of stone aggregate in Hot Mix Plant, laying mix BC by paver and compaction BC 30 mm thick layer Pre-coated aggregate physical requirement/grading/mix composition requirement as per clause 507 MORT&H specifications (Fifth Revision), for correction work between Km 1.884 to Km 3.945, Km 33.262 to Km 33.300 on Road Leh-Upshi and Km 4.345 to Km 4.450, Km 5.000 to Km 5.150, Km 5.700 TO Km 5.800, Km 6.670 to Km 6.720, Km 7.050 to Km 7.156, Km 7.460 to Km 7.726, Km 8.250 to Km 8.345, Km 8.550 to Km 8.630, Km 9.080 to Km 9.193, Km 9.880 to Km 9.910, Km 10.050 to Km 10.100, Km 21.320 to Km 21.350, Km 26.152 to Km 39.883 on Road Upshi-Sarchu.
Providing and applying of tack coat by using bitumen VG-10 grade on existing surface after cleaning all complete as per clause 503 of MORT&H specifications (5th revision) for resurfacing work between Km 1.884 to Km 3.945, Km 33.262 to Km 33.300 on Road Leh-Upshi and Km 4.345 to Km 4.450, Km 5.000 to Km 5.150, Km 5.700 TO Km 5.800, Km 6.670 to Km 6.720, Km 7.050 to Km 7.156, Km 7.460 to Km 7.726, Km 8.250 to Km 8.345, Km 8.550 to Km 8.630, Km 9.080 to Km 9.193, Km 9.880 to Km 9.910, Km 10.050 to Km 10.100, Km 21.320 to Km 21.350, Km 26.152 to Km 39.883 on Road Upshi-Sarchu.
Providing and Mixing of stone aggregate in Hot Mix Plant, laying mix BC by paver and compaction BC 30 mm thick layer Pre-coated aggregate physical requirement/grading/mix composition requirement as per clause 507 MORT&H specifications (Fifth Revision) for resurfacing work between Km 1.884 to Km 3.945, Km 33.262 to Km 33.300 on Road Leh-Upshi and Km 4.345 to Km 4.450, Km 5.000 to Km 5.150, Km 5.700 TO Km 5.800, Km 6.670 to Km 6.720, Km 7.050 to Km 7.156, Km 7.460 to Km 7.726, Km 8.250 to Km 8.345, Km 8.550 to Km 8.630, Km 9.080 to Km 9.193, Km 9.880 to Km 9.910, Km 10.050 to Km 10.100, Km 21.320 to Km 21.350, Km 26.152 to Km 39.883 on Road Upshi-Sarchu.
Road Marking with Thermoplastic Paint as per Clause 803.4 of MORT&H specifications, Fifth revision between Km 1.884 to Km 3.945, Km 33.262 to Km 33.300 on Road Leh-Upshi and Km 4.345 to Km 4.450, Km 5.000 to Km 5.150, Km 5.700 TO Km 5.800, Km 6.670 to Km 6.720, Km 7.050 to Km 7.156, Km 7.460 to Km 7.726, Km 8.250 to Km 8.345, Km 8.550 to Km 8.630, Km 9.080 to Km 9.193, Km 9.880 to Km 9.910, Km 10.050 to Km 10.100, Km 21.320 to Km 21.350, Km 26.152 to Km 39.883 on Road Upshi-Sarchu.
Providing and Fixing of Delineators 600 mm high as per particular specifications between Km 1.884 to Km 3.945, Km 33.262 to Km 33.300 on Road Leh-Upshi and Km 4.345 to Km 4.450, Km 5.000 to Km 5.150, Km 5.700 TO Km 5.800, Km 6.670 to Km 6.720, Km 7.050 to Km 7.156, Km 7.460 to Km 7.726, Km 8.250 to Km 8.345, Km 8.550 to Km 8.630, Km 9.080 to Km 9.193, Km 9.880 to Km 9.910, Km 10.050 to Km 10.100, Km 21.320 to Km 21.350, Km 26.152 to Km 39.883 on Road Upshi-Sarchu.
Providing and Fixing of road stud 100x100 mm as per particular specifications between Km 1.884 to Km 3.945, Km 33.262 to Km 33.300 on Road Leh-Upshi and Km 4.345 to Km 4.450, Km 5.000 to Km 5.150, Km 5.700 TO Km 5.800, Km 6.670 to Km 6.720, Km 7.050 to Km 7.156, Km 7.460 to Km 7.726, Km 8.250 to Km 8.345, Km 8.550 to Km 8.630, Km 9.080 to Km 9.193, Km 9.880 to Km 9.910, Km 10.050 to Km 10.100, Km 21.320 to Km 21.350, Km 26.152 to Km 39.883 on Road Upshi-Sarchu.
M/S T L CONSTRUCTION CO
NEW JEHLUM CONSTRUCTION CO.
ABDULLAH
Taru Enterprises Pvt Ltd
M/S NAWANG THOGMET
M/S TSERING TUNDUP
TSAO STEEL AND CONSTRUCTION COMPANY
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .