Loading…
Loading…
Tender ID
Tender Value
₹1.9 L
EMD Value
₹9,700
Closing Date
18 Mar 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
CONSTRUCTION OF RETENTION WALL WITH COVERED DRAIN NEAR MASJID SHARIEF AT MATIPORA AND IMPROVEMENT OF ROAD FROM MAIN ROAD TO HOUSE OF BASHIR AHMAD PARRAY AND OTHERS AT MATIPORA, SK PORA
2026_RDPR_305879_36
NIT_144_REW_Budgam
Open Tender
Civil Works
Percentage
30 days
SOIBUGH
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹9,700
Yes
11 Mar 2026
11 Mar 2026
19 Mar 2026
11 Mar 2026
18 Mar 2026
11 Mar 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: Rural Engineering wing Budgam
Name of work : Construction of retaining wall with covered drain near masjid sharief at matipora and improvement of road from main road to house of bashir ahmad parray and others at matipora, SK Pora
Contract No: of 2025-26 DATED: -03-2026 Adv cost =Rs 1.94 Lacs
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
0_) Earth workin execavation by manual means in trenches for foundations,drains,pipes,etc. not exceeding 15cm in width BI01010001010000000000000515BI0100001119 CUM _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Providing and laying stone soling hand packed in foundation complete with all costs and carriages of lead 10km avg' BI01010001010000000000000515BI0100001120 CUM _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3coarse sand : 6 graded stone aggregate 20 mm nominal size) BI01010001010000000000000515BI0100001121 CUM _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Centering and shuttering incl. propping strutting and removal of the same upto plinth level FRONT AND BCK BI01010001010000000000000515BI0100001122 SQM _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. BI01010001010000000000000515BI0100001124 KG _(* #,##0.99_);_(* \(#,##0.99\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Provision for headload, signboard,photographs and other unforseen items. BI01010001010000000000000515BI0100001127 job Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
BOQ_993380.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .