Loading
Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 LAccepted-AOC | ₹11.0 L | L1 | Accepted-AOC Lowest |
| 2 | L2₹11.0 LRejected-Finance | ₹11.0 L | L2 | Rejected-Finance Abowe |
| Sl No | Description | Qty | Unit | K K HARIHARAN L2 | A T SABU THOMAS L1 |
|---|---|---|---|---|---|
| 1.00PROVIDING RETAINING WALL AT INDRA NAGAR ST VILLAGE H/O BURLIAR IN COONOOR PANCHAYAT UNION 2025-2026 | |||||
| 1.10 | Earth work excavation for foundation in SDR soil with in initial lead of 10 metres and initial lift of 2 metres and clearing, leveling the site etc. complete complying with standard specifications. | 38.72 | Cum | 370 ₹14,326.40 | 369 ₹14,287.68 |
| 1.20 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | 171.5 | Cum | 740 ₹1.3 L | 737 ₹1.3 L |
| 1.30 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 8.6 | Sqm | 7,380 ₹63,468 | 7,377 ₹63,442.20 |
| 1.40 | Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height) | 94.49 | Cum | 7,690 ₹7.3 L | 7,687 ₹7.3 L |
| 1.50 | Provision for Name Board and Photographic Charge | 1 | LS | 3,005 ₹3,005 | 3,000 ₹3,000 |
| 1.60 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,68,181 ₹1.7 L | 1,68,025 ₹1.7 L |
Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
10 Sept 2025, 3:00 pmClosed
BDO COONOOR
Panchayat Union Coonoor
PROVIDING RETAINING WALL AT INDRA NAGAR ST VILLAGE H/O BURLIAR PANCHAYAT
2025_RDTN_600443_1
hpcnr2024-2025
Open Tender
Civil Works
Burliar
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹12,000
Yes
08-09-2025
21 Jan 2026
4 Sept 2025
10 Sept 2025
4 Sept 2025
10 Sept 2025
4 Sept 2025
8 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid