| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.8 LAdmitted-Finance G 15 PKT 2 NARAINA VIHAR NEW DELHI 110028 | NEW DELHI | DELHI | 110028 | -12.12% | ₹13.8 L | L1 | Admitted-Finance |
| 2 | L2₹15.1 L+₹1.3 L (9.52%)Admitted-Finance | -3.75% | ₹15.1 L+₹1.3 L (9.52%) | L2 | Admitted-Finance |
Tender Value
₹15.7 L
EMD Value
₹31,339
Closing Date
13 Jul 2026, 3:00 pmClosed
EE,ELD-9,DDA
EE,ELD-9,DDA
Comprehensive maintenance of 1 MLD STP.
2026_DDA_914113_1
13/EE/ELD-9/DDA/NIT/ 2026-27
Open Tender
Electrical Works
Works
365 days
Rohini
Please refer Tender documents.
14 documents required · 14 mandatory
₹0
₹31,339
24.06.2026 O/o EE/ELD-9at 12.30 PM
4 Aug 2026
20 Jun 2026
14 Jul 2026
20 Jun 2026
13 Jul 2026
25 Jun 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Comprehensive maintenance of existing 1.0MLD STP plant based on MBBR technology covering all type of TECHNICAL SUPERVISION , plant & machinery installed in the premises as per attached inventory, repairing/ replacement of defective/worn-out/broken/malfunctioning parts of various pump sets, compressors, valves, pipe line, electrical panels/switchgears, cabling /electrical wiring, contactors, timers, relays, thimbles, starters, metering instrument, replacements of gear/machine oils, time to time servicing, preventive maintenance, testing of water samples periodically to ensure required parameters of treated water, maintaining proper records, keeping the complete system functional all the time as per terms & conditions attached and as per directions of engineer-in-charge etc. complete as required.
The engineer shall visit the site once in week or as desired by the engineer-in-charge. | - | Per Month | 1,07,474.4 | - |
| 2 | Washing & Cleaning of all RCC Tanks and MS Tanks, 2 Chambers,1 Main Tank,MBBR 1,MBBR 2,1 Filter Feed Tank etc. complete as required upto the satisfaction of the engineer-in-charge. | - | Job | 3,32,465 | - |
| 3 | Painting & Polishing work as finishing with paint (two or more coats) at all pipe lines prepared including appropriate priming coat, preparation of surface, etc. complete as required upto the satisfaction of the engineer-in-charge.
1 On all pipeline work
2 On all concrete walls | - | Job | 52,245 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.80 MB
BOQ_960653.xls
BOQ • 0.27 MB
NIT13.pdf
Tender Documents • 1.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .