Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC VILL P O CHINCHURIA DIST BURDWAN WB PIN 713378 | CHINCHURIA | BURDWAN | WEST BENGAL | 713378 | ₹3.1 L | L1 | Accepted-AOC AS PER TCR |
| 2 | L2₹3.8 LRejected-Finance KENDA KENDA KENDA BARDHAMAN 713342 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713342 | ₹3.8 L | L2 | Rejected-Finance AS PER TCR |
| 3 | L3₹3.8 LRejected-Finance VILL BAHULA C I JAMBAD COLLIERY BAHULA SIDULI ROAD PANDAVESWAR WEST BENGAL INDIA 713322 | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713322 | ₹3.8 L | L3 | Rejected-Finance AS PER TCR |
| Sl No | Description | Qty | Unit | JAY MAA DAL DALI KALI L1 | BAKSI ENTERPRISE L3 | BANERJEE CONCERN L2 |
|---|---|---|---|---|---|---|
| 1.01 | SUPPLY ERECTION OF 8/9 MTR PCC POLE | 5 | Nos. | 3,800 ₹19,000 | 5,500 ₹27,500 | 5,000 ₹25,000 |
| 1.02 | SUPPLY , FABRICATION, HOISTING AND ERECTION OF PHASE AND EARTH BRACKET AND PAINTING WITH RED OXIDE PRIMER | 200 | kg | 80 ₹16,000 | 100 ₹20,000 | 100 ₹20,000 |
| 1.03 | SUPPLY AND ERECTION OF NUTS, BOLTS, FLATS AND ERECTION OF CLAMPS | 200 | kg | 110 ₹22,000 | 160 ₹32,000 | 160 ₹32,000 |
| 1.04 | SUPPLY AND FIXING OF 7/14 GI WIRE EARTH CONTINUITY AND 6/8 SWG FOR MAKING | 354 | kg | 65 ₹23,010 | 80 ₹28,320 | 80 ₹28,320 |
| 1.05 | SUPPLY AND ERECTION OF HT STAY SET COMPLETE | 25 | Nos. | 800 ₹20,000 | 800 ₹20,000 | 800 ₹20,000 |
| 1.06 | SUPPLY OF ACSR RABBIT/DOG CONDUCTOR | 3,000 | mtr | 55 ₹1.6 L | 67 ₹2.0 L | 67 ₹2.0 L |
| 1.07 | SUPPLY AND INSTALLATION OF 11 KV DISC INSULATOR AND HARDWARE | 35 | Nos. | 900 ₹31,500 | 950 ₹33,250 | 950 ₹33,250 |
| 1.08 | SUPPLY AND INSTALLATION OF 11 KV PIN INSULATOR AND HARDWARE | 26 | Nos. | 500 ₹13,000 | 650 ₹16,900 | 650 ₹16,900 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹4.4 L
EMD Value
₹5,600
Closing Date
15 Jan 2026, 4:00 pmClosed
General Manager Satgram-Sripur Area
Office of the General Manager, Satgram-Sripur Area, PO-Devchandnagar, WestBengal-713332
Major renovation of HT and LT Overhead Lines at Satgram Project under SSA
2025_ECL_350376_1
ECL/SSA/GM/E M/E-NIT/2025-26/115 Dt 31.12.2025
Open Tender
Electrical and Maintenance Works
20 days
Satgram Project
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,600
10 Apr 2026
2 Jan 2026
16 Jan 2026
2 Jan 2026
15 Jan 2026
2 Jan 2026
2 Jan 2026 - 8 Jan 2026
SUPPLY ERECTION OF 8/9 MTR PCC POLE
SUPPLY , FABRICATION, HOISTING AND ERECTION OF PHASE AND EARTH BRACKET AND PAINTING WITH RED OXIDE PRIMER
SUPPLY AND ERECTION OF NUTS, BOLTS, FLATS AND ERECTION OF CLAMPS
SUPPLY AND FIXING OF 7/14 GI WIRE EARTH CONTINUITY AND 6/8 SWG FOR MAKING
SUPPLY AND ERECTION OF HT STAY SET COMPLETE
SUPPLY OF ACSR RABBIT/DOG CONDUCTOR
SUPPLY AND INSTALLATION OF 11 KV DISC INSULATOR AND HARDWARE
SUPPLY AND INSTALLATION OF 11 KV PIN INSULATOR AND HARDWARE
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_363129.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.07 MB
Tendernotice_2.pdf
PDF • 0.80 MB
BOQ_363129.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid