| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹35.0 L+₹62,699.59 (1.82%)Rejected-AOC 4 4 43 GANGAI NAGAR SALEM STEEL PLANT POST SALEM SALEM TAMIL NADU 636013 | SALEM | TAMIL NADU | 636013 | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical Rejected | |
| 4 | Rejected-Technical | - | Rejected-Technical Rejected | |
| 5 | Rejected-Technical 1 118 MARIYAMMAN KOVIL STREET KALPAGANUR POST ATTUR TK SALEM DISTRICT | MADURAI | TAMIL NADU | 625001 | - | Rejected-Technical Rejected |
Tender Value
Refer Docs
EMD Value
₹35,000
Closing Date
17 Jul 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO (BP)
BDO Office , Veerapandi
Construction of Two Class room Building at senapalayam PUE School H/O senapalayam Veerapandy Block at salem District CFSIDS 2025-26
2025_RDTN_578298_1
Roc.No.3616/2024/A2
Open Tender
Civil Works
Item Wise
120 days
BDO, Veerapandi
Technical Qualification
3 documents required · 3 mandatory
₹0
₹35,000
31 Jul 2025
7 Jul 2025
17 Jul 2025
7 Jul 2025
17 Jul 2025
7 Jul 2025
Amount
1.)Construction of Two Class room Building at senapalayam PUE School H/O senapalayam
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed.
Supply and filling of foundation and basement and trenches with filling sand in layers of not more than 15cm thick, well watered,rammed and consolidated complying with standard specification etc.,complete.
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
Supply and filling of foundation and basement and trenches with Excavated Earth in layers of not more than 15cm thick, well watered,rammed and consolidated complying with standard specification etc.,complete.
Supply and filling of good gritty gravel from approved quarry to work site including cost and conveyance of all charges etc complete.
Supplying, fabricating and placing in position mild steel/Ribbed tor steel rods for all RCC works including cost of steel and binding wire also in all floors, complete complying with standard specfication.
Supplying and erecting CENTERING for sides and soffits including supports and strutting upto 3.29 m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, canopy etc., in all floors with all cross bracings using mild steel sheets of size 90cm x 60cm and BG 10 stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over countrywood joists of size 10cm x 6.50cm spaced at about 90cm centre to centre and supported by casuarian props of 10cm to 13cm dia spaced at 75cm centre to centre etc., complete
Square and Rectanglar column
REINFORCED CEMENT CONCRETE 1:1.5:3 mix using 20mm gauge hand broken hard granite stone jelly for FOUNDATION FOOTINGS including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
Roof Beam
BRICK WORK in cement mortar 1:5 (One cement and five sand) using second class country bricks of size 23cm x 11cm x 7cm for the following including curing etc., complete complying with standard specifications. (Masonry projections wherever necessary for obtaining required elevation shall be done without extra cost).
Main building
Providing and constructing 110mm brick masonry in C.M 1:3 for partition wall using wall burnt best quality bricks incuding cost for materials & labour charges etc complete
PLASTERING with cement mortar 1:5 (one cement and five sand)12mm thick in all floors complying with standard specifications.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly clean out of dust and scrubbing. The surface shall then be allowed to dry for atleadt 48 hours. It shall then be sand papered (water proof abrasive sheet) to give a smooth and even surface. Anyunevenness shall be made good by applying Ist coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of Ist coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothl, etc., complete complying with standard specifications and directed by the Department officers. (The rates are inclusive of hire charges for grinding machine with wheel, coat of sand paper (waterproof abrasive sheet), cost of putty blade ,labour charges for grinding the jointsand sand papering, two coat of putty,scrapping the putty area to level the surface smooth,etc.,complete). The putty should be got approved by the excutive Engineer before use on work.(Based on Sor 2023-2024) PWD Department Bulidings - chennai (Tecnical circular No. AEE / T10 /24475/201/8 dated 01.02.2019)
Fabrication and supply of M.S door, Window including cost and conveyance of all charges etc complete Steel Door
Steel Window
Paving the Top of roof with Solar reflective ceramic tiles of size 305 x 305 x 7mm thick of approved quality and colour laid in Cement mortar 1:3 (One cement and three M.Sand) 12mm thick and pointed with tile grout (Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint, curing etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by the Executive Engineer before use on works)
Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Paving the floor with pre-polished concrete anti-skid step tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Oil bound distemper painting over priming coat including cost and conveyance of all materials and labour charges etc complete.
Exterior Emulsion Two coats over priming coat including cost and conveyance of all materials and labour charges etc complete.
Painting two coats using Ist quality readymix enamel paint of approved colour over new iron work including cost and conveyance and all labour charges etc.
Provision for rainwater downfall pipe etc complete.
Provisions for Cubboard arrangements for Students ( As per sub estimate)
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124)
Provisions for Cubboard arrangements for Students ( As per sub estimate)
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124)
Construction of Teaches rack for cupboard
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124)
Construction of Teaches rack for cupboard
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124)
Provisions for drawing Bala painting including all cost and conveyance of men and materials etc.,(the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Towards the cost for supply and fixing of magnetic green fibre board including of all charges etc complete.
Manufacturing, Supplying and Fixing of Stainless Steel Hand rails for staircase near wet riser using 50mm dia 304L Grade Stainless Steel pipe of 1.60mm thick will be provided with tubular supports made of 304L Grade Stainless Steel pipe of 25mm dia of 1.60mm thick welded to the railing. The supports will be grouted into the wall and provided with 93.00mm thick Stainless Steel circular base plate of 304 Grade. The rate shall included for grouting into concrete with necessary supporting arrangements the hand rail in floor polishing buffing, bonding, cutting, grinding, conveyance, welding charges, electrical charges, etc. complete
Providing Eletrification Arrangements as per Subestimate
Light/Fan point SD 21
AC ceiling fan SD 108
Tube Light SD 88
Plug point SD 13
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
MARIAPPAN & CO (BID ID -1403295)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .