Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.9 L+₹290.89 (0.10%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.9 L
EMD Value
₹8,700
Closing Date
21 Jul 2026, 3:00 pmClosed
Executive Eng REW Kupwara
Executive Eng REW Kupwara
Renovation of community hall at ward 03 Mundian-A
2026_RDPR_315899_13
NIT NO 54 OF 2026-27 ADF KEREN
Open Tender
Civil Works
Percentage
Executive Eng REW Kupwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Eng REW Kupwara
₹8,700
1 Aug 2026
14 Jul 2026
21 Jul 2026
14 Jul 2026
21 Jul 2026
14 Jul 2026
14 Jul 2026 - 14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling roofing including ridges, hips valleys and gutters etc., and stacking the material within 50 meters lead of :
15.28.1 G.S. Sheet | 15.61 | Sqm | 122 | ₹1,904.83 |
| - | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead. | 29.82 | Sqm | 37.9 | ₹1,130.18 |
| - | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 12.23 | Cum | 479.3 | ₹5,861.84 |
| - | P/l of stone soling / RBM including all carriages.by MT 15km Avg Lead | 2.07 | Cum | 1,000 | ₹2,073.26 |
| - | Providing and laying in position cement concrete of specified grade including curing but including the cost of centring and shuttering. All work upto plinth level with: 1:3:6 MIX Nallah aggregates | 5.28 | Cum | 5,200 | ₹27,468.89 |
| - | Providing and laying in position specified grade of reinforced cement concrete including curing but including the cost of centering, shuttering, finishing and reinforcement.1:2:4 MIX using nallah agg. | 0.4 | Cum | 7,500 | ₹2,968.53 |
| - | Steel reinforcement for R.C.C. work including straightening,cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars | 0.28 | Qtl | 11,535 | ₹3,195.92 |
| - | 12mm Plaster in 1:6 mix | 76.36 | Sqm | 266.2 | ₹20,327.03 |
| - | Wood work in Superstructure and Trusses including all fittings and fixtures and all carriages involved complete job. (KD Wood) | 0.21 | Cum | 45,000 | ₹9,450 |
| - | C.G.I. SHEETS ROOFING
Providing colour coated corrugated G. S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface) excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
12.1.6 0.50 mm thick with zinc coating not less than 275 gram/m2 | 21.85 | Sqm | 847.4 | ₹18,515.69 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_1027090.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .