Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.6 LAccepted-AOC | L1 | Accepted-AOC Accepted. | |
| 2 | L2₹41.8 L+₹1.2 L (2.99%)Rejected-AOC | L2 | Rejected-AOC Rejected. | |
| 3 | L3₹44.4 L+₹3.8 L (9.30%)Rejected-AOC | L3 | Rejected-AOC Rejected. |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
14 Sept 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Archaeologist, ASI, Hampi Circle.
O/o the SA, ASI, Hampi Circle, Hospet. 583225
EXECUTION OF WORK UNDER MW (CONS) TO SABHA MANTAPA AND SUB SHRINE AT VIRUPAKSHA TEMPLE AT HAMPI
2022_ASI_708373_1
3/2/3/HMC/2019-20
Open Tender
Civil Works - Roads
Works
180 days
Hampi
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1.2 L
Yes
Kamalapur
21 Oct 2022
24 Aug 2022
15 Sept 2022
24 Aug 2022
14 Sept 2022
24 Aug 2022
29 Aug 2022
Amount
Sub Heading 1
Labour charges for carefully removing the cement concrete over the existing ancient flooring slabs and disposing the unwanted stuff away from the site, etc complete as per the direction of site in-charge.
Labour charges for carefully removal of props steps and brick masonry and platforms constructed in size stone masonry and stacking the useful materials and disposing the unwanted stuff away from the site, etc complete as per the direction of site in-charge.
Labour charges for carefully removal of WPC on the roof consisting of brick bats and stocking the useful materials and disposing the unwanted stuff away from the site, etc complete as per the direction of site in-charge.
Labour charges for dismantling the out of plumb roof slabs, beams, capitals, pillars, etc by engaging highly skilled labours and with the help of chain-pulley block and derric pole after proper documentation like numbering, etc complete as per the direction of site in-charge and stocking for re-use at suitable distance.
Labour charges for providing fresh granite stone beams, capitals and pillars including dressing charges as per the original and erection charges with the help of chain-pulley, derric pole, engaging High skilled labourers etc., complete. (Stone blocks will be issued departmentally) as per the direction of site in-charge.
Labour charges for reconstruction of the dismantled architecture members with the help of chain-pulley, derric pole, engaging High skilled labourers etc., complete as per the direction of site in-charge.
Labour charges for removing the existing uneven/undulated flooring slabs and stacking/keeping them away at a distance for re-use, etc., complete as per the direction of site in-charge.
Labour charges for removal of earthwork excavation to a depth of 10 to 12cms average for laying of lime concrete for fixing the stone slabs and disposing the unwanted materials away from the site, etc., complete as per the direction of site in-charge.
Labour charges for providing bed concrete in Lime mortar for uniform flooring of ratio 1:2 for fixing of the stone flooring slabs (Sand, lime and Surkhi will be issued departmentally), etc., complete as per the direction of site in-charge.
Labour charges for erection and dismantling of scaffolding from ground level to top level for dismantling the modern Accretionary wall in the Northern & Southern Bazar and within the Virupaksha Temple Complex including transportation of scaffolding materials from stock yard Kamlapur to Virupaksha Temple Hampi etc,. Complete as per the direction of site in-charge.
Labour charges for Removing modern Accretionary wall with in the Virupaksha Temple complex, Northern & Southern side Bazar mantapas very carefully without causing the ancient structures and disposing the debris out the temple complex, cleaning etc., complete as per the direction of site in-charge.
Labour charges for providing and laying weather proof course with lime surkhi in lime mortar 1:2. (Sand, lime,Surkhi and brick jelly will be issued departmentally) etc,. Complete as per the direction of site in-charge.
B JAGANNATHASWAMY
V Padbhanabhan
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .