| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 CrAccepted-AOC 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | ₹8.9 Cr Quoted ₹9.0 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹9.1 Cr+₹15.1 L (1.68%)Rejected-AOC HOUSE NO 3000 SECTOR 15 HOUSING BOARD COLONY SONIPAT 131001 | SONIPAT | SONIPAT | HARYANA | 131001 | ₹9.1 Cr+₹15.1 L (1.68%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹9.6 Cr+₹61 L (6.79%)Rejected-AOC F 31 INDUSTRIAL AREA PHASE VIII SAS NAGAR MOHALI 160071 | S A S NAGAR | PUNJAB | 160071 | ₹9.6 Cr+₹61 L (6.79%) | L3 | Rejected-AOC Rejected |
| 4 | L4₹9.7 Cr+₹71 L (7.90%)Rejected-AOC 2 HOUSE NO 214 FRIENDS COLONY RAJIV NAGAR MANDI DABWALI 125104 | MANDI DABWALI | SIRSA | HARYANA | 125104 | ₹9.7 Cr+₹71 L (7.90%) | L4 | Rejected-AOC Rejected |
| 5 | L5₹10.4 Cr+₹1.4 Cr (15.9%)Rejected-AOC | ₹10.4 Cr+₹1.4 Cr (15.9%) | L5 | Rejected-AOC Rejected |
Tender Value
₹9.8 Cr
EMD Value
₹19.5 L
Closing Date
24 May 2023, 3:00 pmClosed
AMIT KUMAR SANDILA
EE PHE Division No. 3 Palwal
Rough cost estimate for upgradation 9 MLD Sewage Treatment Plant, (Based on MBBR) Technology Located at Hodal town, District Palwal (Haryana)
2023_HRY_278540_1
2023BC0FCB72 B913 4ECA 99E4 312E2D484DA0561PUH
Open Tender
Civil Works
Works
360 days
Hodel
Refer to Tender Documents
3 documents required · 3 mandatory
₹20,000
₹19.5 L
Yes
17 Aug 2023
3 May 2023
24 May 2023
3 May 2023
24 May 2023
3 May 2023
Amount
Up gradation and commissioning after conversion of existing 9 MLD Capacity sewage Treatment based on Moving Bed Biological Reactor Technology (Attached growth process) to combined activated sludge process in conjunction with MBBR Bio film process with addition of new Mechanical Coarse and Fine Screens, Internal Recirculation Pumps, Treated Effluent Lifting Pumps with Tertiary Treatment based on Disc Filters followed by Chlorination in existing STP complete in all respect with PLC with data transfer through modem to website, Transformer for additional capacity and all other works contingent thereto including Operation and Maintenance of existing STP /MPS during up- gradation period and 3 months of trial run period 12 months defects liability period after and 5 years thereafter on the commissioning of up- gradated STP i.e completion of tertiary treatment plant at Hodal Town Distt. Palwal. (a) Entire Civil works as per DNIT (As per detail attached and inclusive of OandM). (The rate quoted by contractor shall be bifurcated into capital cost (as 80%) and OandM cost (as 20%) of quoted L.S cost)
Up gradation and commissioning after conversion of existing 9 MLD Capacity sewage Treatment based on Moving Bed Biological Reactor Technology (Attached growth process) to combined activated sludge process in conjunction with MBBR Bio film process with addition of new Mechanical Coarse and Fine Screens, Internal Recirculation Pumps, Treated Effluent Lifting Pumps with Tertiary Treatment based on Disc Filters followed by Chlorination in existing STP complete in all respect with PLC with data transfer through modem to website, Transformer for additional capacity and all other works contingent thereto including Operation and Maintenance of existing STP /MPS during up- gradation period and 3 months of trial run period 12 months defects liability period after and 5 years thereafter on the commissioning of up- gradated STP i.e completion of tertiary treatment plant at Hodal Town Distt. Palwal. (b) Entire Electro mechanical instrumentation works as per DNIT – Existing mechanical equipment, any other works contingent thereto (As per detail attached and inclusive of OandM). (The rate quoted by contractor shall be bifurcated into capital cost (as 80%) and OandM cost (as 20%) of quoted L.S cost)
Up gradation and commissioning after conversion of existing 9 MLD Capacity sewage Treatment based on Moving Bed Biological Reactor Technology (Attached growth process) to combined activated sludge process in conjunction with MBBR Bio film process with addition of new Mechanical Coarse and Fine Screens, Internal Recirculation Pumps, Treated Effluent Lifting Pumps with Tertiary Treatment based on Disc Filters followed by Chlorination in existing STP complete in all respect with PLC with data transfer through modem to website, Transformer for additional capacity and all other works contingent thereto including Operation and Maintenance of existing STP /MPS during up- gradation period and 3 months of trial run period 12 months defects liability period after and 5 years thereafter on the commissioning of up- gradated STP i.e completion of tertiary treatment plant at Hodal Town Distt. Palwal. (c) Entire Electrical instrumentation works as per DNIT – Existing Electrical instrumentation any other works contingent thereto (As per detail attached and inclusive of OandM). (The rate quoted by contractor shall be bifurcated into capital cost (as 80%) and OandM cost (as 20%) of quoted L.S cost)
Jaiveer Singh Contractor
Hydrotech Paryavaran India Pvt. Ltd.
M/s Sourabh Construction Pvt. Ltd.
Anand Associates
HL HANDA AND CO
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .