Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.2 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹25.8 L+₹60,724.30 (2.41%)Accepted-Finance R O DHOMKHAR | L2 | Accepted-Finance Admitted | |
| 3 | L3₹26.6 L+₹1.4 L (5.48%)Accepted-Finance SAKTI BLOCK KHARU UNDER CCDF | NA | NA | 491229 | L3 | Accepted-Finance Admitted | |
| 4 | L4₹27.9 L+₹2.7 L (10.5%)Accepted-Finance | L4 | Accepted-Finance Admitted | |
| 5 | L5₹28.9 L+₹3.7 L (14.7%)Accepted-Finance CHOGLAMSAR CHOGLAMSAR CHOGLAMSAR LEH LEH LADAKH 194101 | LEH LADAKH | LADAKH | 194101 | L5 | Accepted-Finance Admitted |
| Sl No | Description | Qty | Unit | M/S THINLESS ANGCHOK GOVT CONTRACTOR L4 | Stanzin Tundup L7 | SP.FABRICATION L6 | sonam tundup L1 | M/S YOKMA STEEL FABRICATION L5 | JAYSON ENTERPRISES L8 | Aggxima Entrprise L2 | M/S JARA STEEL FABRICATION L11 | M/S TSEWANG NAMGAIL L9 | M/S KHARU FABRICATION L3 | M/S SD FABRICATION L10 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Providing and laying of chainlink fencing at Kargyam Barma TRF=4600rft | ||||||||||||||
| 1.01 | Earth work in excavation by mechanical means ( hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth, lead upto 50 m and lift upto 1.5m All kind of soil. | 41.91 | cum | 250 ₹10,477.5 | 400 ₹16,764 | 370 ₹15,506.7 | 100 ₹4,191 Lowest | 250 ₹10,477.5 | 250 ₹10,477.5 | 250 ₹10,477.5 | 350 ₹14,668.5 | 250 ₹10,477.5 | 400 ₹16,764 | 150 ₹6,286.5 |
| 1.02 | Providing and laying in cement concrete of specified grade include. Curing but excluding the cost of centering and shuttering . All work uto plinth level of 1:3:6 ( 1 cement, 3 coarse sand, 6 stone aggregate of 20mm nominal size crushed stone aggregate) in blocks. | 41.91 | cum | 5,500 ₹2,30,505 | 5,000 ₹2,09,550 | 5,600 ₹2,34,696 | 5,500 ₹2,30,505 | 5,100 ₹2,13,741 | 7,000 ₹2,93,370 | 5,100 ₹2,13,741 | 8,000 ₹3,35,280 | 5,600 ₹2,34,696 | 3,500 ₹1,46,685 Lowest | 6,500 ₹2,72,415 |
| 1.03 | Providing and fixing of Angle Iron fence Post made of MS angles (50x50x6mm) in build up sections and framed works including , cutting housing single section 2.14 mtr ling with 15 cm foot/toe at the bottom with hole drilled and top bends. | 4,429.8 | kgs | 90 ₹3,98,682 | 110 ₹4,87,278 | 95 ₹4,20,831 | 80 ₹3,54,384 Lowest | 105 ₹4,65,129 | 100 ₹4,42,980 | 100 ₹4,42,980 | 130 ₹5,75,874 | 105 ₹4,65,129 | 103 ₹4,56,269.4 | 110 ₹4,87,278 |
| 1.04 | Centering and shuttering including strutting, propping etc removal of form for : Foundation, footings baseds of columns etc for mass concrete. | 81 | sqm | 250 ₹20,250 | 300 ₹24,300 | 230 ₹18,630 | 200 ₹16,200 | 150 ₹12,150 | 120 ₹9,720 Lowest | 150 ₹12,150 | 120 ₹9,720 Lowest | 150 ₹12,150 | 400 ₹32,400 | 250 ₹20,250 |
| 1.05 | Providing and fixing of G.I chainlink fencing fabric 4mm dia fence cold dip galvanized of required mesh size 10cmx10cm wire of (4"x4") mesh, including strenthening /binding with 2mm dia wire or nut bolts and washer as required completely. | 4,945 | kgs | 110 ₹5,43,950 | 110 ₹5,43,950 | 110 ₹5,43,950 | 100 ₹4,94,500 Lowest | 115 ₹5,68,675 | 115 ₹5,68,675 | 102 ₹5,04,390 | 130 ₹6,42,850 | 140 ₹6,92,300 | 103 ₹5,09,335 | 120 ₹5,93,400 |
| 1.06 | Providing and layig and strengthening of barbed wire at top of the fence post including all jobs. | 230 | kgs | 100 ₹23,000 Lowest | 140 ₹32,200 | 100 ₹23,000 Lowest | 120 ₹27,600 | 105 ₹24,150 | 110 ₹25,300 | 100 ₹23,000 Lowest | 130 ₹29,900 | 105 ₹24,150 | 103 ₹23,690 | 120 ₹27,600 |
| 1.07 | Supply at site Angle iron post and strand of required size including bottom to be split and bend at trianglular in opposite direction of 10cm length and drill hook uto 10mm dia etc of complete job. | 1,311 | kgs | 110 ₹1,44,210 | 110 ₹1,44,210 | 95 ₹1,24,545 | 80 ₹1,04,880 Lowest | 105 ₹1,37,655 | 110 ₹1,44,210 | 100 ₹1,31,100 | 130 ₹1,70,430 | 105 ₹1,37,655 | 103 ₹1,35,033 | 110 ₹1,44,210 |
| 1.08 | Providing and instalation of fabric iron Gates 6'x12'= 1Nos with angle iron framed including , master pillars (6"x6") with cutting hoisting welding and all fitted and fixture and all lead completely. Total 160.00 kgs | 160 | kgs | 110 ₹17,600 | 200 ₹32,000 | 115 ₹18,400 | 90 ₹14,400 Lowest | 105 ₹16,800 | 110 ₹17,600 | 100 ₹16,000 | 130 ₹20,800 | 105 ₹16,800 | 103 ₹16,480 | 110 ₹17,600 |
| 1.09 | Providing and instalation of fabric iron Gates 4'x6'= 1Nos with angle iron framed including , master pillars (6"x6") with cutting hoisting welding and all fitted and fixture and all lead completely. =50 kgs | 50 | kgs | 110 ₹5,500 | 150 ₹7,500 | 115 ₹5,750 | 90 ₹4,500 Lowest | 105 ₹5,250 | 110 ₹5,500 | 100 ₹5,000 | 130 ₹6,500 | 105 ₹5,250 | 103 ₹5,150 | 110 ₹5,500 |
Tender Value
₹38.6 L
EMD Value
₹77,140
Closing Date
1 Oct 2025, 4:00 pmClosed
Divisional Forest Officer, Leh
Divisional Forest Office, Leh Fort Road UT of Ladakh
Providing and fixing of chain-link fencing at Kargyam Barma and Phobrang area of Durbuk Forest Range for the year 2025-26 under the scheme CAMPA 52d
2025_FEE_17549_3
e-Tender No 18 of FDL 2025-26
Open Tender
Civil Works - Others
Item Rate
30 days
Durbuk
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Divisional Forest Officer, Leh
₹77,140
25 Oct 2025
18 Sept 2025
2 Oct 2025
18 Sept 2025
1 Oct 2025
18 Sept 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .