| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹2.7 L+₹11,060.10 (4.22%)Rejected-AOC | L2 | Rejected-AOC L2 bidder | |
| 3 | L3₹2.8 L+₹20,332.88 (7.75%)Rejected-AOC | L3 | Rejected-AOC L3 bidder |
Tender Value
₹4.0 L
EMD Value
₹5,050
Closing Date
20 Feb 2023, 6:00 pmClosed
SO(min)
AGM Office Kanhan Area
Proposal sanction/Approval for the work of dismantling and re-installation of 37kw Endless haulage from 14L 4D to 1X0X19R in 1X 2X Drift section at Tndsi mine, Kanhan Area.
2023_WCL_270421_1
kaaomin E-36/2022-23
Open Tender
Miscellaneous Works
Item Rate
60 days
Tandsi mine
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,050
23 Jul 2024
9 Feb 2023
21 Feb 2023
9 Feb 2023
20 Feb 2023
9 Feb 2023
9 Feb 2023 - 14 Feb 2023
Amount
Dismantling of 14L /4D endless haulage
Manual transportation of base frame of 37 KW/550V endless haulage including loading & unloading from 14L/4D to 1X-0X/19R
Manual transportation of Surge Wheel of 37kw/550V Endless Haulage including loading & unloading from 14L/4D to 1X-0X/19R
Manual transportation of gearbox of 37kw/550V Endless Haulage including loading & unloading from 14L/4D to 1X-0X/19R
Manual transportation of breaks, coupling guards and fencing etc. of 37kw/550V , Endless haulage including loading & unloading from 14L/4D to 1X-0X/19R
Manual transportation of FLP Resistance Box, of 37KW/550V Endless Haulage including loading & unloading from 14L/4D to 1X-0X/19R
Manual transportation of FLP Starter, Circuit Breaker & Drum Controller of 37KW/550V Endless Haulage including loading & unloading from 14L/4D to 1X-0X/19R
Manual transportation of 4feet C.I. Pulley with Frame of 37KW/550V Endless Haulage including loading & unloading from S/F to U/G or U/G to U/G.
Manual transportation of Electric motor of 37KW/550V, for Endless Haulage including loading & unloading from 14L/4D to 1X-0X/19R
Manual Transportation of Rope22sqmm of length 500Mtrs of 37KW/550V endless Haulage including loading & unloading from S/F to U/G or U/G to U/G
Assembly/disassembly of 37kw/550v endless haulage complete
Laying fitting fixing signaling wire for endless haulage at all along endless haulage line as per instruction engineer incharge. Length 200Mtrs including loading & unloading from S/F to U/G or U/G to U/G
Earth work in excavation in foundation or drains (not exceeding 1.5m in width or 10sqm on plan) including dressing of side and ramming of bottoms lift up to 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m. 1) Endless foundation= 3.0 x 2.0 x 1.0 = 6.00 Cum 2) Motor = 1.5 x 0.75 x 0.75 = 0.84 Cum 3) C.I Pulley = 3 (1.50 x 1.00 x 0.80) = 3.60 Cum
Providing & laying in position cement concrete specified grade excluding the cost of centering and shuttering – All work up to plinth level 1:2:4 (1cement: 2fine sand: 4 graded stone aggregate stone 20mm normal size). 1) Endless foundation= 2.80x1.90x1.0 = 5.32 Cum 2) Motor = 1.20 x0.60x 0.75 = 0.54 Cum 3) C.I Pulley = 3 (1.20 x 0.80 x 0.60) = 1.73 Cum
Transportation of material S/F to U/G (a) Cement
(b) Sand
(c) Stone aggregates
Total impact of GST for the purpose of CTC
IMTEYAZ AHMAD
kamalsingh arse
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_279952.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .