Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹37.1 L
EMD Value
₹38,000
Closing Date
14 Jul 2020, 3:00 pmClosed
THE PROJECT DIRECTOR DRDA DINDIGUL
THE PROJECT DIRECTOR DRDA DINDIGUL
Dindigul District-13th Finance Savings Fund 2019-20 Vedasandur block road works TN-05-43
2020_RDTN_168901_1
1768/2020/A2 13th Finance Savings Fund TN-05-43
Open Tender
Civil Works - Roads
Item Rate
120 days
THE PROJECT DIRECTOR DRDA DINDIGUL
Dindigul District-13th Finance Savings Fund 2019-20 Vedasandur block road works TN-05-43
4 documents required · 4 mandatory
₹0
₹38,000
THE PROJECT DIRECTOR DRDA DINDIGUL
24 Jul 2020
17 Jun 2020
14 Jul 2020
17 Jun 2020
14 Jul 2020
17 Jun 2020
24 Jun 2020
Amount
Part 1 : Renewal of BT Road from NH7 to Gandhi Nagar Road km 0/0-2/0 Estimate Amount Rs.22.55 lakhs
Clearing the scrub jungle by uprooting including all cutting charges and depositing disposing of the products and clearing as directed by the Departmental Officers including all incidential charges etc., complete in charges etc complete
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Applying TACK COAT over BT surface at 3 Kg of RS-1 Bitumen Emulsion/ 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60 KG for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Providing and laying Gravel soling to compacted thick includng all labour charges for spreading watering and leveling to camber forundulation forundulation of surface etc complete 100% compaction at optimum moisture content and hire & fuel chares for power roller, water sprinkler and all other incidential charges such as traffic barricading and providing danger lights etc., completed
Supply of Kilometre Stone of size 1.65x0.45x0.15metre
Supply of Hectametre Stone of size 0.90x0.15x0.15metre
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 2 : Renewal of BT Road from Usilampatti to Indhra Nagar Road km 0/0-1/3 Estimate Amount Rs.14.63 lakhs
Clearing the scrub jungle by uprooting including all cutting charges and depositing disposing of the products and clearing as directed by the Departmental Officers including all incidential charges etc., complete in charges etc complete
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Applying TACK COAT over BT surface at 3 Kg of RS-1 Bitumen Emulsion/ 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60 KG for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Providing and laying Gravel soling to compacted thick includng all labour charges for spreading watering and leveling to camber forundulation forundulation of surface etc complete 100% compaction at optimum moisture content and hire & fuel chares for power roller, water sprinkler and all other incidential charges such as traffic barricading and providing danger lights etc., completed
Supply of Kilometre Stone of size 1.65x0.45x0.15metre
Supply of Hectametre Stone of size 0.90x0.15x0.15metre
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S VELLAISAMY CONTRACTOR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .