| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹48.7 LAdmitted-Fee/PreQual/Technical/Finance | -30.30% | ₹48.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹50.3 L+₹1.6 L (3.31%)Admitted-Fee/PreQual/Technical/Finance | -27.99% | ₹50.3 L+₹1.6 L (3.31%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹54.5 L+₹5.9 L (12.1%)Admitted-Fee/PreQual/Technical/Finance | -21.89% | ₹54.5 L+₹5.9 L (12.1%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹56.5 L+₹7.9 L (16.2%)Admitted-Fee/PreQual/Technical/Finance | -18.99% | ₹56.5 L+₹7.9 L (16.2%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹58.5 L+₹9.8 L (20.2%)Admitted-Fee/PreQual/Technical/Finance | -16.25% | ₹58.5 L+₹9.8 L (20.2%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹69.8 L
EMD Value
₹1.4 L
Closing Date
13 Aug 2026, 4:00 pmClosed
Executive Engineer RnB Division Langate
RnB Division Langate
Construction of Multi functional/Zonal Education Hall at Middle School Adora for Education Zone Mawer
2026_PWDJK_319313_1
22/1730-39/2026-27/RnB/Langate Dated 03/08/2026
Open Tender
Civil Works
Percentage
10 days
Langate
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,600
MH 0059
₹1.4 L
17 Aug 2026
4 Aug 2026
14 Aug 2026
4 Aug 2026
13 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches or drains (not exceeding 1.5 m in width as well as 10 Sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed., within a lead of 50 metres: All kinds of soil : | 97.94 | cum | 256.85 | ₹25,155.89 |
| 2 | P/L of dry stone soling duly hand packed including all carriages loading unloading complete job before laying of mud mate in trenches incl. all carriages of material involved & head load. | 11.18 | cum | 1,200 | ₹13,416 |
| 3 | P/L in position cement concrete of specified grade excl. the cost of centering and shuttering: 1:4:8 (1 cement 4: coarse sand 8 graded stone crushed agg.40mm nominal size). Incl all carraiges of material involved. | 8.39 | cum | 5,577.9 | ₹46,798.58 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 5.1.2 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 20.35 | cum | 8,138 | ₹1,65,608.3 |
| 5 | Providing/laying in position specified grade excluding the cost of centering & shuttering . (M-15 Mix) 1:2:4 (1 Cement: 2 Coarse Sand: 4 graded stone aggregate 20mm nominal size- crushed.) Incl all carraiges of material involved All work upto plinth level | 0.4 | cum | 6,941 | ₹2,776.4 |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m | 60.05 | cum | 218.4 | ₹13,114.92 |
| 7 | Supply and filling of GSB under floors including all carraiges complete job | 67.84 | cum | 1,200 | ₹81,408 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 degree, landings, balconies, shelnes, chajjas, lintels, bands, plain window sills, stair cases and spiral stair cases upto floor V level excluding cost of centering, shuttering, finishing and reinforcement with (M-20 Mix) 1:1.5:3 (1 Cement: 1.5 Coarse Sand: 3 graded stone aggregate 20mm nominal size- crushed.) Incl all carraiges of material involved. | 23.52 | cum | 10,171 | ₹2,39,221.92 |
| 9 | Reinforcement for RCC works including straightening cutting bending placing in position and binding all complete (Thermomechanically Treated Bars) Incl. carraige and head load.Thermo-Mechanically Treated bars of grade Fe-500D or more | 3,509.47 | kg | 123.2 | ₹4,32,366.7 |
| 10 | Centring and shuttering including strutting proping and removal of form work for foundations, footings, bases of columns slabs etc for mass concrete. | - | - | - | - |
stage.html
html • 0.03 MB
finance_1057013.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_1057013.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .