Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.7 LAccepted-AOC 1A 118 NIT FARIDABAD 121001 | FARIDABAD | HARYANA | 121001 | ₹74.7 L | L1 | Accepted-AOC Doe to lower rates |
| 2 | Not Admitted-Fee/PreQual/Technical H NO 196 LAJPAT NAGAR FATEHABAD HARYANA 125050 | HISAR | HARYANA | 125050 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | prashant construction company L1 |
|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundations, trenches etc. in all kinds of soil, not exceeding 2 meters depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry in 15 cm layers with compaction, including disposal of all surplus soil as directed within a lead of 30 Mtrs. (HSR 6.6) | 363.99 | cum | - |
| 2.00 | Scraping- Cement plaster [HSR 8.32 ( c)] | 2,335.67 | Sqm | - |
| 3.00 | Dismantling white or coloured glazed tiles (to be carefylly removed) [HSR 8.38] | 804.96 | Sqm | - |
| 4.00 | Cement concrete 1:6:12 with brick ballast 20 mm nominal size in foundation and plinth [HSR 10.31] | 47.76 | cum | - |
| 5.00 | Cement concrete 1:4:8 with brick ballast 20 mm nominal size in foundation and plinth. [HSR 10.37] | 3.88 | cum | - |
| 6.00 | Cement concrete 1:2:4 with stone aggregate 20 mm nominal size in foundation and plinth. [HSR 10.41] | 13.72 | cum | - |
| 7.00 | Cement concrete 1:1½:3 with stone aggregate 20 mm nominal size for reinforced concrete work in Shelves excluding steel reinforcement, but including centring and shuttering, laid in position, complete in all respect. [HSR. 10.81+10.95 (a)]. | 4.25 | cum | - |
| 8.00 | Cement concrete 1:1½:3 with stone aggregate 20 mm nominal size for reinforced concrete work in slabs with with inclination not exceeding 25 degree with horizontal, excluding steel reinforcement, but including centring and shuttering, laid in position, complete in all respect. [HSR. 10.82 + 10.95 (a)]. | 10.2 | cum | - |
| 9.00 | Cement concrete 1:1½:3 with stone aggregate 20 mm nominal size for reinforced concrete work for walls exceeding 20 cm thickness (Straight and curved) beams, girders, stairs, columns, (square or rectangular) battens and lintels etc. excluding steel reinforcement but including centring and shuttering, laid in position complete in all respects. [HSR. 10.86 + 10.95 (a)] | 19.8 | cum | - |
| 10.00 | Cement concrete 1:1½:3 with stone aggregate 20mm nominal size for reinforced concrete work in footing, strips, foundation, rafts, pedestal and approach slabs of bridges etc. but excluding steel reinforcement and including centring and shuttering, laid in position, complete in all respects. (for work upto 1.5 Mtrs. below ground level). [HSR. 10.90 + 10.95 (a)]. | 17.35 | cum | - |
Tender Value
₹68.5 L
EMD Value
₹1.4 L
Closing Date
2 Sept 2019, 5:00 pmClosed
Executive Engineer
Executive Engineer Provincial Division PWD BandR Branch Faridabad
Renovation, upgradation of DAV Centenary College NH-3, NIT Faridabad Under RUSA grant REINVITED
2019_HRY_97381_1
6032-6081
Open Tender
Civil Works - Buildings
180 days
NH-3 NIT Faridabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Executive Engineer Provincial Division BandR
₹1.4 L
Faridabad
27 Jan 2026
24 Aug 2019
4 Sept 2019
24 Aug 2019
2 Sept 2019
24 Aug 2019
27 Aug 2019
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid