Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹506.0 CrAccepted-AOC | ₹506.0 Cr Quoted ₹543.8 Cr | L1 | Accepted-AOC Accepted L1 |
| 2 | L2₹561.2 CrRejected-Finance | ₹561.2 Cr | L2 | Rejected-Finance Quoted Higher Rates |
| 3 | L3₹574.4 CrRejected-Finance | ₹574.4 Cr | L3 | Rejected-Finance Quoted Highest Rates |
Tender Value
₹523.6 Cr
EMD Value
₹2.7 Cr
Closing Date
18 Sept 2025, 11:00 amClosed
CGM/Civil
C-4, District Center, Saket, New Delhi
CONSTR. OF TUNNEL T1 FROM CHAINAGE..., TUNNEL 2 FROM CHAINAGE... WITH BLT AND ...FORMATION ON APPROACHES ... IN ... NEW BG RAILWAY LINE BETWEEN MANGLIYAGAON (INDORE) TO BUDNI STATIONS ...,BHOPAL DIVISION ... IN MP, INDIA Pkg Tunnel T1,Part Tunnel T2
2025_IRCON_247630_1
IRCON/1400032/IND BNI/Tunnel
Limited
Civil Works
1095 days
Indore, Madhya Pradesh
Please refer Tender documents.
5 documents required · 5 mandatory
₹50,000
IRCON INTERNATIONAL LIMITED
₹2.7 Cr
24 Feb 2026
4 Sept 2025
19 Sept 2025
4 Sept 2025
18 Sept 2025
4 Sept 2025
Government eProcurement System Created By: Raju Kambale Created Date/Time: 19-Sep-2025 03:28 PM Tender Title: CONSTR. OF TUNNEL T1 FROM CHAINAGE..., TUNNEL 2 FROM CHAINAGE... WITH BLT AND ...FORMATION ON APPROACHES ... IN ... NEW BG RAILWAY LINE BETWEEN MANGLIYAGAON (INDORE) TO BUDNI STATIONS ...,BHOPAL DIVISION ... IN MP, INDIA Pkg Tunnel T1,Part Tunnel T2 Tender ID: 2025_IRCON_247630_1
Tender Inviting Authority: Chief General Manager/Civil/PH, IRCON International Limited
Name of Work: CONSTRUCTION OF TUNNEL T1 FROM CHAINAGE KM 33+160 TO KM 34+400 AND TUNNEL 2 FROM CHAINAGE KM 60+300 TO KM 66+040 WITH BALLAST LESS TRACK AND WORKS RELATED TO FORMATION ON APPROACHES OF SUCH TUNNELS IN CONNECTION WITH CONSTRUCTION OF ELECTRIFIED NEW BG RAILWAY LINE BETWEEN MANGLIYAGAON (INDORE) TO BUDNI STATIONS (198 KMS) OF RATLAM DIVISION AND BHOPAL DIVISION OF WESTERN RAILWAY AND WEST CENTRAL RAILWAY RESPECTIVELY IN MADHYA PRADESH STATE, INDIA"(Pkg : Tunnel T1 & Part Tunnel T2)
Contract No: IRCON/1400032/IND-BNI/Tunnel Dated 04/09/2025
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 HES INFRA PRIVAE LIMITED (GSTN-36AABCH8954L1Z1) BID ID -902261 5236160709.78 9.70 5744068298.63 Five Hundred Seventy Four Crore Fourty Lakh Sixty Eight Thousand Two Hundred and Ninty Eight
2.00 SSNR Projects Private Limited (GSTN-NA) BID ID -900599 5236160709.78 3.85 5437752897.11 Five Hundred Fourty Three Crore Seventy Seven Lakh Fifty Two Thousand Eight Hundred and Ninty Seven
3.00 prasad AND company project works (GSTN-NA) BID ID -900836 5236160709.78 7.18 5612117048.74 Five Hundred Sixty One Crore Twenty One Lakh Seventeen Thousand Fourty Eight
Lowest Amount Quoted BY: SSNR Projects Private Limited(5437752897.11)
BOQ Summary Details Tender Title: CONSTR. OF TUNNEL T1 FROM CHAINAGE..., TUNNEL 2 FROM CHAINAGE... WITH BLT AND ...FORMATION ON APPROACHES ... IN ... NEW BG RAILWAY LINE BETWEEN MANGLIYAGAON (INDORE) TO BUDNI STATIONS ...,BHOPAL DIVISION ... IN MP, INDIA Pkg Tunnel T1,Part Tunnel T2 Tender ID: 2025_IRCON_247630_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 SSNR Projects Private Limited (BID ID -900599) 5437752897.11 L1
2 prasad AND company project works (BID ID -900836) 5612117048.74 L2
3 HES INFRA PRIVAE LIMITED (BID ID -902261) 5744068298.63 L3
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Corrigendum.rar
Tender Documents • 10.91 MB
BOQ_283589.xls
BOQ • 0.36 MB
BOQ.pdf
BOQ • 1.27 MB
Tender_Document.pdf
Tender Documents • 0.98 MB
Download all tender documents and submit your bid