Loading…
Loading…
Tender Value
₹65.8 L
EMD Value
₹65,900
Closing Date
24 Jun 2026, 5:00 pm
Superintending Engineer
O/o the SE, Balasore Irrigation Division, Balasore
Canal improvement
2026_CEBML_131484_23
e-Procurement Notice No.SEBID 02 of 2026-27
National Competitive Bid
Civil Works - Canal
120 days
Baliapal Block of Balasore District
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹65,900
Yes
9 Jun 2026
9 Jun 2026
25 Jun 2026
9 Jun 2026
24 Jun 2026
9 Jun 2026
9 Jun 2026 - 15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in all kinds of soil including dressing and levelling the bed and depositing the excavated soil clear of work site with all leads, lifts, delifts and dewatering including removing bushes, stumps and any other foreign materials from the working area as well as from the foundation trenches with cost of all labour, T&P, hire and running charges of all machineries, labour welfare cess etc. complete in all respects as per specification and direction of the Engineer-In-Charge. | 1,868.63 | One Cum | 206.1 | ₹3,85,124.64 |
| 2 | Earth work in excavation of foundation in Slushy soil (in water upto 0.60m depth requiring the aid of pans vessels) including dressing and levelling the bed and depositing the excavated soil clear of work site with all leads, lifts, delifts and dewatering including removing bushes, stumps and any other foreign materials from the working area as well as from the foundation trenches with cost of all labour, T&P, hire and running charges of all machineries, labour welfare cess etc. complete in all respects as per specification and direction of the Engineer-In-Charge. | 204.31 | One Cum | 283.3 | ₹57,881.02 |
| 3 | Plain Cement concrete in Open Foundation M15 with 40 mm downgraded crusher broken hard granite chips including mixing with concrete mixer, hoisting and laying manually, compacting by vibrator including cost, conveyance, royalty of all materials complete including watering etc. as directed by the Engineer-in-charge | 70.03 | One Cum | 6,765.5 | ₹4,73,787.97 |
| 4 | RCC/Cement concrete M25 with 20 mm downgraded crusher broken hard granite chips including mixing with concrete mixer, hoisting and laying manually, compacting by vibrator including cost, conveyance, royalty of all materials complete including watering etc. as directed by the Engineer-in-charge | 188.69 | One Cum | 7,905.6 | ₹14,91,707.66 |
| 5 | Cement concrete M20 with 20 mm downgraded crusher broken hard granite chips including mixing with concrete mixer, hoisting and laying manually, compacting by vibrator including cost, conveyance, royalty of all materials complete including watering etc. as directed by the Engineer-in-charge | 18.42 | One Cum | 7,518 | ₹1,38,481.56 |
| 6 | Providing 375 mm Single underreamed with 940 mm dia bulb compacting driven with RCC M 25 with 20 mm down graded crusher broken chips including cost of boring holes of required depth including cost, conveyance, taxes, labour, T & P etc. complete (excluding cost of MS rod and labour charges ) as per direction of Engineer-in-Charge . | 29 | One Pile | 13,755.1 | ₹3,98,897.9 |
| 7 | Rough stone dry packing in approns and revetments with hard granite stone boulder of 15cm to 30cm size including filling the interstices with small stones and jallies with cost, carriage, royalty labour welfare cess and taxes of all materials etc. complete as per specification and direction of Engineer-In-Charge. | 167.21 | One Cum | 3,268 | ₹5,46,442.28 |
| 8 | Providing form work of concrete in irrigation structure with F1 finish of upstream faces of dam, spillway, galcis of barrages, unexposed surface of foundation, block joints etc. with steel shutters rigidly fixed and removal of forms and making good to the surface where necessary complete with all labour, materials and T&P complete as directed by the Engineer-in-charge. | 57.78 | One Sqm | 879.4 | ₹50,811.73 |
| 9 | Providing formwork for concrete with F2 finish for all permanently exposed surfaces not prominently exposed to public view such as in galleries, adits, bridges, retaining walls, open spillway etc. with steel shutters or plywood shutters including supply or rigid tie and supports with all labours, material and T and P complete including finishing complete as directed by Engineer-in-Charge .(abrupt surface irregularities over 5mm and gradual over 10 mm measured with 1.50mm templete is not permitted) complete with all labour, materials and T&P complete as directed by the Engineer-in-charge. | 507.4 | One Sqm | 930.4 | ₹4,72,084.96 |
| 10 | Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification including cost, conveyance, royalty of all materials complete including watering etc. as directed by the Engineer-in-charge | 193.78 | One Qtl | 8,283.4 | ₹16,05,157.25 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
TechBIDSEBID_24.pdf
Tender Documents • 2.25 MB
BOQ_595307.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid