Tender Value
₹4.5 L
EMD Value
₹9,000
Closing Date
29 Aug 2026, 6:00 pmDue today
Estate Officer, MPUAT
Estate Officer, MPUAT
Remaining Repair work of Threshing floor in GPB dept., RCA
2026_MPUAT_583703_6
E NIT 06(2026-27)
Open Tender
Civil Works
Percentage
90 days
MPUAT
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Estate officer, MPUAT
₹9,000
Yes
29 Aug 2026
7 Aug 2026
31 Aug 2026
7 Aug 2026
29 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge: In cement mortar. | - | Cum. | 641 | - |
| 2 | Dismantling stone slab/ terrazo chip flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meters lead. | 0.05 | Sqm. | 80 | ₹4 |
| 3 | Dismantling doors, windows and clearstory windows steel or wood shutter including chowkhats and holdfasts etc. complete and stacking within 50 meters lead:Of area 3 square meter and below. | 4 | Each | 105 | ₹420 |
| 4 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). | - | Cum. | 3,847 | - |
| 5 | Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in : Cement Mortar 1:6 ( 1-Cement : 6-Sand). | - | Cum. | 3,479 | - |
| 6 | Half brick masonry in Superstructure , above plinth level upto floor V level using bricks of designation 75 Cement mortar 1 : 4 (1 cement : 4 coarse sand) | - | Sqm | 553 | - |
| 7 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete: | 280 | Kg. | 81 | ₹22,680 |
| 8 | Steel work in built up tubular trusses including cutting, hoisting ( height upto 10 m)fixing in position and applying a priming coat of approved steel primer, welded and bolted including special shaped washers etc. complete. | 550 | Kg. | 100 | ₹55,000 |
| 9 | Providing and fixing T-iron frames for doors, windows and ventilators of mild steel Tee-sections, joints mitred and welded with 15x3 mm lugs 10cm long embedded in cement concrete blocks 15x10x10 cm of 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) or with wooden plugs and screws or rawl plugs and screws or with fixing clips or with bolts and nuts as require including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer. | 90 | Kg. | 83 | ₹7,470 |
| 10 | Providing and fixing steel gate, grating , and grills made of angles, tees, square bars, flats,or black pipe with holdfast and fittings complete as per design and drawing including cutting welding and fabrication with priming coat of red oxide | 550 | Kg. | 96 | ₹52,800 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.78 MB
FIN_06_06.pdf
Tender Documents • 7.14 MB
BOQ_1036984.xls
BOQ • 0.37 MB
corrigendum06.pdf
PDF • 0.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].