Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC | ₹9.6 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹10.6 L+₹1.0 L (10.5%)Rejected-AOC | ₹10.6 L+₹1.0 L (10.5%) | L2 | Rejected-AOC Rejected |
Tender Value
₹10.1 L
EMD Value
₹10,100
Closing Date
24 Feb 2026, 5:00 pmClosed
Executive Engineer, CD-I
At Bikash Bhawan, Jagannathlane, Badambadi, Cuttack 753012
Construction of C.C. drain and culvert from Subala Shop to Chandu res in Ward No. 13.
2026_ORULB_125939_3
MC(CMC)CTC_Div-I_No.23/2025-26
Open Tender
Civil Works - Others
Percentage
60 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹10,100
Yes
14 Jul 2026
16 Feb 2026
27 Feb 2026
16 Feb 2026
24 Feb 2026
16 Feb 2026
16 Feb 2026 - 24 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50m | - | CUM | 858.6 | - |
| 2 | Construction of Coffer dam by using sand bag and laying under water as per specification | - | NOS | 23.2 | - |
| 3 | Earth work for excavation of foundation in all kinds of soil incl. levelling and dressing the bed etc. complete | - | CUM | 299.52 | - |
| 4 | Filling plinth with sand including watering and ramming etc. complete. | 1 | CUM | 612.7 | ₹612.09 |
| 5 | P.C.C (1:3:6) using 4cm. Size BHGCB metal including the cost of all merials, labour carriage, royalty etc. complete | 13.96 | CUM | 6,393.8 | ₹89,257.45 |
| 6 | R.C.C (M20) using 12mm.size BHGCB chips including all cost complete | 1 | CUM | 6,552.1 | ₹6,545.55 |
| 7 | C.C (1:2:4) using 12mm. Size BHGCB metal including the cost of all merials, labour carriage, royalty etc. complete | 23.2 | CUM | 8,041.7 | ₹1,86,567.44 |
| 8 | Rigid and smooth centering and shuttering for Drain work incl. cost of all materials. | 1 | SQM | 248.7 | ₹248.45 |
| 9 | Cutting, straitening, bending,binding of HYSD Bar & tying the grills and placing in position etc.complete incl.cost | 1 | QNTL | 9,395.3 | ₹9,385.9 |
| 10 | Removing Old Slab from Drain Wall and refixing the same after completion of work etc. | 45 | NOS | 111.8 | ₹5,031 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_581417.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_581417.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .