| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.9 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹12.8 Cr+₹96.8 L (8.16%)Admitted-Finance CHINAR COMMERCIAL COMPLEX THE BUND RESIDENCY ROAD SRINAGAR 190 001 | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | L2 | Admitted-Finance | ||
| 3 | L3₹12.8 Cr+₹98.3 L (8.30%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹17.4 Cr
EMD Value
₹34.7 L
Closing Date
25 Apr 2025, 4:00 pmClosed
Executive Engineer IFCD Sumbal
Irrigation Colony Sumbal Sonawari
Construction of RCC Retaining Wall over Pile Foundation with Stone Pitching on LP Bund of River Jhelum from RD 96.400-96.550 KM, Masonry Retaining Wall on Right Side of River Jhelum at Sumbal RD 102.370 to 102.540 KM, Masonry...
2025_IFC_275253_1
e-NIT No. 02 of 2025-26
Open Tender
Civil Works
Percentage
630 days
District Bandipora
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,000
Executive Engineer IFCD Sumbal
₹34.7 L
O/O Chief Engineer Kmr IFC Department Srinagar
15 May 2025
5 Apr 2025
26 Apr 2025
5 Apr 2025
25 Apr 2025
5 Apr 2025
12 Apr 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All Kinds of Soil. | 22,146.04 | Cum | 187.3 | ₹41,47,953.29 |
| 1.2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All Kinds of Soil | 1,317.52 | Cum | 592.9 | ₹7,81,157.61 |
| 2Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil | |||||
| 2.1 | 1st Lift | 2,632.71 | Cum | 89.75 | ₹2,36,285.72 |
| 2.2 | 2nd Lift | 88.35 | Cum | 179.5 | ₹15,858.82 |
| 3 | Extra rates for quantities of works executed : In or under water and/ or liquid mud, including pumping out water as required. | 4,636.49 | Cum | 37.46 | ₹1,73,682.92 |
| 4 | Dumping of Stones, in horizontal, on level, including cost of stones | 4,378.64 | Cum | 937.9 | ₹41,06,726.46 |
| 5 | Close timbering over areas including strutting, shoring and packing cavities (wherever required) etc. complete. (Measurements to be taken of the face area timbered). Depth exceeding 3 m but not exceeding 4.50 m | 6,479.98 | Sqm | 242.4 | ₹15,70,747.15 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc. | 3,314.59 | Sqm | 628.95 | ₹20,84,709.49 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of formwork. | 4,901.3 | Sqm | 286.35 | ₹14,03,487.26 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.42 MB
BOQ_848305.xls
BOQ • 0.30 MB
BOQ.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .