Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹37.5 L
EMD Value
₹40,000
Closing Date
27 Sept 2022, 1:00 pmClosed
SE, EWC, DVVNL, Agra
Urja Bhawan 220 KV S/s Sikandra Bypass Road, Agra
For Modification of Transformer Oil Filling System at workshop Jhansi under EWD, Jhansi
2022_DVVNL_723763_1
36/2022-23
Open Tender
Electrical Works
Piece-work
365 days
DVVNL
As Per Pre Qualifying Conditions
2 documents required · 2 mandatory
₹3,540
www.dvvnl.org
₹40,000
30 Sept 2022
27 Aug 2022
27 Sept 2022
27 Aug 2022
27 Sept 2022
27 Aug 2022
Dismentaling of old horizontal type 30 KL tank from RCC grouted plinth including loading, unloading and draining of old oil including cleaning of slaze of old tank.
Modification of existing 30 KL horizontal oil storage tank to be converting 30 KL vertical type oil storage tank (including cutting, welding, fabrication work) and sealing of existing 600mm dia hole and cutting new 600mm dia hole on the top of the tank and fitting the flange with blind plate to cover the top and providing 200mm another hole at bottom side for cleaning system of reclaim oil.
Laying work of 30KL Oil Tank from horizontal position to vertical position as per site conditions. All labour, crane, hydra etc. will arranged by the contractor.
Dismentaling of old horizontal type 10 KL tank from RCC grouted plinth including loading, unloading and draining of old oil including cleaning of slaze of old tank.
Modification of existing 10 KL horizontal oil storage tank to be converting 10 KL vertical type oil storage tank (including cutting, welding, fabrication work) and sealing of existing 600mm dia hole and cutting new 600mm dia hole on the top of the tank and fitting the flange with blind plate to cover the top and providing 200mm another hole at bottom side for cleaning system of reclaim oil.
Laying work of 10KL Oil Tank from horizontal position to vertical position as per site conditions. All labour, crane, hydra etc. will arranged by the contractor.
Fabrication/modification of main hole fitting for oil storage Tank capacity 10/30KL.
Required civil work with all required material and labour for vertical oil storage tank foundation as per site conditions.
Rubbing, cleaning and painting of Transformer Oil storage Tank Capacity 30 KL.
Rubbing, cleaning and painting of Transformer Oil storage Tank Capacity 10 KL.
Supply and erection of Digital flow meter totalizer with sensor including complete fitting.
Supply and erection of Nozzle along with hose pipe including complete fitting.
Supply and erection of 1 HP 2800 RPM (crompton/kirlosker/ABB or equalvalent make) geared pump flame proof 3 phase motor, float valve & ball valve funnel complete fitting between underground oil tank to 30 KL TF Oil Tank.
Supply and erection of 1 HP 1440 RPM (crompton/kirlosker/ABB or equalvalent make) geared pump flame proof 3 phase motor, float valve & ball valve funnel complete fitting between 10 KL Oil Tank No.1 to 10 KL TF Oil Tank no.2.
Supply and erection of 1 HP 1440 RPM (crompton/kirlosker/ABB or equalvalent make) geared pump flame proof 3 phase motor, float valve & ball valve funnel complete fitting with NRV valve and pressure guage & byepass pipe line and connection with all fitting for 10 KL T/F Oil Tank.
Supply and laying 40/32 NB MS black pipe line along with bend, tee, flange and valve for underground oil drainage tank to 30 KL storage tank.
Supply and laying 40/32 NB MS black pipe line along with bend, tee, flange and valve for 10 KL T/F Oil Tank to supply pipe line and connection between 10 KL storage tanks completely.
40/32 NB header with Cl ball valve, flange type and ASA flange Tee, Bend fitting for 10/30 KL Oil storage tanks.
Supply and fixing SPO Pump with 1 HP single phase motor Y type strainer wheel valve, bend, flange for reclaim oil unloading from tanker to 10 KL Tanks.
Supply and fixing Centrifugal mono block pump 1 HP Driven with motor for oil shifting from transformer body to dirty oil underground tank.
Supply and laying of 25 NB pipe line with valve, tee, flange & bend for shifting transformer body to dirty oil underground tank.
Supply and fixing of heavy duty mobile trolley with 1HP 1440 RPM 50Hz oil pump kit along with oil flow meter and 200 ltr. Drum complete with nozzle, hose pipe upto 5 mtr.
Saction flexible pipe 10 meter long approx for oil transfer from transformer body & Tank
Supply and fabrication of Ladder with railing and support on the top of tank for 10 KL and 30 KL Tank.
Civil work with trench for underground pipe line & electric cable through the plant.
Civil work with material for vertical storage tank foundation 02 Nos tank
Supply & Erection of 4 KL fresh oil heating tank Dia 1350X3100 mm long MS sheet thick 4mm with main hole 32/40 NB wheel valve 4 K.W Haeter 03 nos, temp sencor and 50mm Thick insulation with aluminium cladding.
Supply and fixing of Control panel with main MCB, Rotary Switch, Lamp hooter & pressure switch for oil delivery pumps.
Supply and laying of electrical wiring as per site requirement. (All labour, materail etc. will be arranged by the contractor at his own cost.)
Fabrication & erection charges of all pipe line with consumable item (Welding electrodes, grinding wheels & LPG & oxygen gas)
Corrosition painting for preventing for underground pipe line
M/s JAI BALAJI ENTERPRISES
R.S ASSOCIATES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .